Loading...
Prologis Park 121 Northwest Dr--DR170426 DAILY CONSTRUCTION REPORT DATE ___04/26/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Overcast OWNER Prologis TEMP 63 WIND NW 24 CONTRACTOR: Mycon HUMIDITY 78 3 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -CalHar is doweling and tying the steel for the throats on the storm drain -Pavecon is still grading the sidewalk on Northwest Dr. North SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.