Prologis Park 121 Northwest Dr--DR170426
DAILY CONSTRUCTION REPORT
DATE ___04/26/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Overcast
OWNER Prologis
TEMP 63
WIND NW 24
CONTRACTOR: Mycon
HUMIDITY 78
3
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-CalHar is doweling and tying the steel for the throats on the storm drain
-Pavecon is still grading the sidewalk on Northwest Dr. North
SIGNATURE
PUBLIC WORKS INSPECTOR