Prologis Park 121 Northwest Dr--DR170427
DAILY CONSTRUCTION REPORT
DATE ___04/27/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Sunny
OWNER Prologis
TEMP 73
WIND SE 19
CONTRACTOR: Mycon
HUMIDITY 40
3
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-CalHar Pour 4 of the storm drain necks on Northwest Dr. South
-I inspected the steel for the sidewalks on Northwest Dr. North
-
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.