Loading...
Prologis Park 121 Northwest Dr--DR170428 DAILY CONSTRUCTION REPORT DATE ___04/28/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER Prologis TEMP 75 WIND S 12 CONTRACTOR: Mycon 79% HUMIDITY 3 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Pavecon is pouring the sidewalk on the south side of Northwest Drive North -CalHar plans to pour 4 more of the storm drain necks SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.