CONSTRUCTION ACTIVITIES:
-The contractor delayed the sidewalk pour until tomorrow
-Pavecon doesn’t want to place concrete down with the chance of rain
-Pavecon is installing chairs on the steel for the pour
-I informed Chet from Mycon that IPs need to be installed
-He said it should be installed before the rain