Prologis Park 121 Northwest Dr--DR170503 DAILY CONSTRUCTION REPORT DATE ___05/03/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER Prologis TEMP 74 WIND SSW 9 CONTRACTOR: Mycon HUMIDITY 82 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -The contractor delayed the sidewalk pour until tomorrow -Pavecon doesn’t want to place concrete down with the chance of rain -Pavecon is installing chairs on the steel for the pour -I informed Chet from Mycon that IPs need to be installed -He said it should be installed before the rain SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.