Prologis Park 121 Northwest Dr--DR170502 DAILY CONSTRUCTION REPORT DATE ___05/02/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Sunny OWNER Prologis TEMP 86 CONTRACTOR: Mycon WIND SSE 10 HUMIDITY 30 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Pavecon has re-graded the sidewalk area -The rebar is being installed and concrete will be onsite tomorrow at 9:00am -I informed the contractor that densities needed to be taken and that the some loose debris needed to be removed SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.