Prologis Park 121 Northwest Dr--DR170502
DAILY CONSTRUCTION REPORT
DATE ___05/02/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Sunny
OWNER Prologis
TEMP 86
CONTRACTOR: Mycon
WIND SSE 10
HUMIDITY 30
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Pavecon has re-graded the sidewalk area
-The rebar is being installed and concrete will be onsite tomorrow at 9:00am
-I informed the contractor that densities needed to be taken and that the some loose debris needed to be removed
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.