Old Town Phase 4-CS170518T H E • C 1 T Y • O F
COPPELL
Gregory K. Yancey May 18, 2017
Provident Company, Inc.
RE: Final Acceptance Letter
Old Town Addition
Lot 1R -25R Block G (Phase IV)
Dear Mr. Yancey:
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. The two-year maintenance bonds have been received.
Maturity on the bonds will be two years from the date of this letter. Maturity on the
Erosion Control Bond LC will also be two years from the date of this letter.
You may notify MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow up inspection of the facilities will be conducted prior to the lapse of the two-
year bond period. If any punch list items are noted at that time, you will be contacted to
make repairs.
Sincerely,
Matthew Mabry
Construction Inspector
Office Phone: (214) 406-5223
cc: Ken Griffin, P.E., Director of Engineering and Public Works
Kent Collins, P.E., Assistant Director of Engineering
Michael Garza, P.E., Assistant Director of Public Works
Suzanne Arnold, Chief Building Official
Tim Oates, Deputy Fire Chief
Jennifer Miller, Finance Director
A FAMILY COMMUNITY FOR A LIFETIME
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV