Loading...
Old Town Phase 4-170517 1Dallas | San Antonio | Houston | Midland | 800.880.6689 | ib-tx.com MAINTENANCE BOND DETAIL PAVECON JOB# 1702508 JOB NAME: MAIN STREET COPPELL PHASE 4 CONTRACTOR: PAVECON PUBLIC WORKS, LP LOCATION: COPPELL, TEXAS DATE: MAY 5, 2017 BID ITEM NO. DESCRIPTION I CONTRACT U/M UNIT $ QTY AMOUNT $ SANITARY SEWER 1 8" PVC SDR -35 LF 58.59 440 25,779.60 2 4"SEWER SERVICE W/DBL CLEANOUT EA 906.00 12 10,872.00 3 12" BORE W/CASEMENT PIPE LF 177.54 30 5,326.20 4 CONNECT TO EXISTING MANHOLE EA 1,717.00 1 1,717.00 5 4' MANHOLE EA 4,321.00 3 12,963.00 6 TESTING LS 1,953.00 1 1,953.00 7 TRENCH SAFETY LF 2.37 440 1,042.80 STORM SEWER 1 CONNECT TO EXISTING 18" RCP EA 1,776.00 1 1,776.00 2 18" CLASS III RCP LF 112.44 10 1,124.40 3 5' CURB INLET EA 3,403.00 1 3,403.00 4 REMOVE/DISPOSE EXISTING 5' INLET EA 1,350.00 1 1,350.00 5 PLUG 18" RCP EA 415.00 1 415.00 6 REM/REPLACE EXIST PAVEMENT SF 8.88 756 6,713.28 7 TRENCH SAFETY LS 592.00 1 592.00 TOTALS 75,027.28 CITY OF COPPELL MAINTENANCE BOND REQUIREMENTS: 2 YEAR, 50% 3 r6cw v Cottlei Contractor: Pavecon Public Works, LP Total Bonded $ 37,513.64 Amount