Loading...
Freeport NIP(2.3)-LR 960923F-,,~ E: a I I~:1--11~ i nE:~' i=llr'll~ GEOTECHNICAL AND ENVIRONHI:NTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Coppell Mill Limited Partnership Distribution Center Royal Lane at Gateview Boulevard Coppell, Texas REPORTED TO: CONTRACTOR: Coppell Mill Limited Partnership 100 Schelter Road Lincolnshire, Illinois 60069-3621 ATTN: Mr. Terry Schwarting Raymond Construction Company, Inc. REPORT NO. 38 REPORT DATE: 09-23-96 REG PROJECT NO. 2665.2 DATE OBSERVED: 09-06-96 TECHNICIAN: S. Boeshart Paving leave out, north side - length of building. Civil Plans These deviations were __corrected __ not corrected No deviations were observed. All reinforcing steel appeared to be placed in accordance with contract documents & CRSI. Distribution: (1) Coppell Mill Limited Parnership/ Mr. Terry Schwarting (1) Mayse & Associates/ Mr. Mike Mayse (1) Raymond Construction Co., Inc./ Mr. Charles Raymond (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. RFPJysh 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019