Priscilla Martinez
From:George Marshall
Sent:Wednesday, May 03, 2017 2:46 PM
To:Louis Macias
Cc:Priscilla Martinez; Mike Glenn (cmglenn@glennengineering.com); Tim Oates; Scott
Latta
Subject:Re: Mike,
Categories:This message has been archived by Retain on May 03 2017 17:43
I guess the fdc issue is complete... please make the other minor fixes and submit 3 plan sets to engineering
along with PDF and full cad plans. At that point we can schedule a precon.
George Marshall, P.E.
Sent from my phone.
From: Louis Macias <lmacias@coppellisd.com>
Sent: Wednesday, May 3, 2017 2:15:36 PM
To: George Marshall
Cc: Scott Latta; Mike Glenn (cmglenn@glennengineering.com); Tim Oates
Subject: RE: Mike,
George,
I spoke to Tim Oats back at the beginning of the planning of this project about this very thing and he was OK with having
the multiple FDC’s as long as we came up with a suitable solution that he approves for Identifying each FDC. Because the
way the buildings are laid out if would be very costly to have it all as one system.
Let me know if you want to chat about this.
Thanks for your help getting this wrapped up!
Louis
From: George Marshall \[mailto:GMarshall@coppelltx.gov\]
Sent: Wednesday, May 03, 2017 1:58 PM
To: Mike Glenn (cmglenn@glennengineering.com) <cmglenn@glennengineering.com>
Cc: Louis Macias <lmacias@coppellisd.com>; Scott Latta <SLatta@coppelltx.gov>
Subject: Mike,
th
Please find attached comments regarding the 9 Grade Center.
Overall the project looks good but as my colleagues pointed out, there are problems with the fire suppression
system. Please reduce to One FDC.
Thank You, George
1
George S. Marshall, P.E.
Engineering Manager
Engineering & Public Works
City of Coppell, TX
972-304-3562 (office)
www.coppelltx.gov
2