Loading...
9th Grade Center-CS170503 Priscilla Martinez From:George Marshall Sent:Wednesday, May 03, 2017 2:46 PM To:Louis Macias Cc:Priscilla Martinez; Mike Glenn (cmglenn@glennengineering.com); Tim Oates; Scott Latta Subject:Re: Mike, Categories:This message has been archived by Retain on May 03 2017 17:43 I guess the fdc issue is complete... please make the other minor fixes and submit 3 plan sets to engineering along with PDF and full cad plans. At that point we can schedule a precon. George Marshall, P.E. Sent from my phone. From: Louis Macias <lmacias@coppellisd.com> Sent: Wednesday, May 3, 2017 2:15:36 PM To: George Marshall Cc: Scott Latta; Mike Glenn (cmglenn@glennengineering.com); Tim Oates Subject: RE: Mike, George, I spoke to Tim Oats back at the beginning of the planning of this project about this very thing and he was OK with having the multiple FDC’s as long as we came up with a suitable solution that he approves for Identifying each FDC. Because the way the buildings are laid out if would be very costly to have it all as one system. Let me know if you want to chat about this. Thanks for your help getting this wrapped up! Louis From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Wednesday, May 03, 2017 1:58 PM To: Mike Glenn (cmglenn@glennengineering.com) <cmglenn@glennengineering.com> Cc: Louis Macias <lmacias@coppellisd.com>; Scott Latta <SLatta@coppelltx.gov> Subject: Mike, th Please find attached comments regarding the 9 Grade Center. Overall the project looks good but as my colleagues pointed out, there are problems with the fire suppression system. Please reduce to One FDC. Thank You, George 1 George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov 2