Prologis Park-DR170227 DAILY CONSTRUCTION REPORT DATE ___02/27/2017__________ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER CITY of COPPELL TEMP 75 WIND S 15 CONTRACTOR: CORE HUMIDITY 67 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: The contractor is still hanging steel o the building pad Potter is prepping for the last panel to be poured Friday Mycon is working on putting a crane together SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.