Prologis Park-DR170227 (2) DAILY CONSTRUCTION REPORT DATE ___02/27/2017__________ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER CITY of COPPELL TEMP 79 CONTRACTOR: CORE WIND S 17 HUMIDITY 59 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Potter is still forming the panels for the wall panels Will attempt to hang wall panel later this afternoon I spoke to Chet about the crane being moved from the east side of the property to the west side of the property. The Chance from Mycon spoke to Tim Oats from Fire, Tony Pletcher from PD, Mr. George says that it’s ok, but they should consider blocking traffic at 121 and Sandy Lake. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.