Prologis Park-DR170227 (2)
DAILY CONSTRUCTION REPORT
DATE ___02/27/2017__________ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER CITY of COPPELL
TEMP 79
CONTRACTOR: CORE
WIND S 17
HUMIDITY 59
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Potter is still forming the panels for the wall panels
Will attempt to hang wall panel later this afternoon
I spoke to Chet about the crane being moved from the east side of the property to the west side of the property. The Chance from Mycon spoke to
Tim Oats from Fire, Tony Pletcher from PD, Mr. George says that it’s ok, but they should consider blocking traffic at 121 and Sandy Lake.
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.