Prologis Park-DR170301
DAILY CONSTRUCTION REPORT
DATE ___03/01/2017_03:25pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Sunny
OWNER CITY of COPPELL
TEMP 64
CONTRACTOR: CORE
WIND N 19
HUMIDITY 13
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Mycons sub is installing wall panel braces
Wall panels will not be placed because of the windy weather
Pumping water off the property
Potter is still working on wall panels
I got the ok to run the crane across the street and temp closing the road.
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.