Loading...
Prologis Park-DR170301 DAILY CONSTRUCTION REPORT DATE ___03/01/2017_03:25pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Mostly Sunny OWNER CITY of COPPELL TEMP 64 CONTRACTOR: CORE WIND N 19 HUMIDITY 13 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Mycons sub is installing wall panel braces Wall panels will not be placed because of the windy weather Pumping water off the property Potter is still working on wall panels I got the ok to run the crane across the street and temp closing the road. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.