Loading...
Prologis Park-DR170303 DAILY CONSTRUCTION REPORT DATE ___03/03/2017_03:25pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Mostly Sunny OWNER CITY of COPPELL TEMP 64 CONTRACTOR: CORE WIND N 19 13 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: Mycon is still working on hanging wall panel Mycon is also working on connecting the steel to the wall panels Potter is still working on pouring wall panels SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.