Prologis Park-CS170530
Priscilla Martinez
From:Marcus Marion
Sent:Wednesday, May 31, 2017 7:07 AM
To:Priscilla Martinez
Subject:Prologis - Park 121 Bldg 3 and 6
This is a follow-up to the conversation
From: George Marshall
Sent: Tuesday, May 30, 2017 12:19 PM
To: Dillon, Casey <cdillon@prologis.com>
Cc: Matthew Mabry <MMabry@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>; Darryl Zbranek
<dzbranek@coppelltx.gov>; Kent Collins <KCollins@coppelltx.gov>; Kenneth Griffin <KGriffin@coppelltx.gov>; Michael
Garza <MGarza@coppelltx.gov>
Subject: RE: Prologis - Park 121 Bldg 3 and 6
Casey,
The Engineering Department cannot speak to temp co’s. Those are issued by Building Inspections/Community
Development. I will touch base with them.
However, we have an understanding on the channel issues along Coppell Road that they would be complete prior to us
finalizing building 3. Last time I drove by, the area was in poor condition. You have still not provided a solution to the
standing water in your Dry detention basins. We expect an engineered solution that will be submitted for approval.
In addition, Ken and I talked this AM and recalls that we would not allow any final Co’s on any of the buildings until the
chasm issue has been resolved. Whether it is based on contractor beginning work or end could be up for discussion, but
at this time, no final Co’s
As a side note, your engineer has changed grades on the building 3 project which has impact on your drainage system
and retaining walls without submitting to us for approval. Any plan revisions, need to be at the very least discussed and
cleared.
I believe Ken is waiting on a detailed price for the work on the chasm.
Thank You, George
George S. Marshall, P.E.
Engineering Manager
Engineering & Public Works
City of Coppell, TX
972-304-3562 (office)
469-964-4731 (cell)
www.coppelltx.gov
From: Dillon, Casey \[mailto:cdillon@prologis.com\]
Sent: Tuesday, May 30, 2017 10:03 AM
To: Kenneth Griffin <KGriffin@coppelltx.gov>; George Marshall <GMarshall@coppelltx.gov>; Michael Garza
<MGarza@coppelltx.gov>
1
Cc: Matthew Mabry <MMabry@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>
Subject: Prologis - Park 121 Bldg 3 and 6
Gentlemen –
The construction of Park 121 building 3 and 6 will be ‘complete’ in a number of week. I have heard from the field team
that Coppell will no longer issue TCOs (that’s pretty unique). So, in preparation for the project completion and CO, I
wanted to reach out and request an understanding of any Park requirements that your department may have. In other
words the non-obvious items, in the past there has been attention on erosion\\silt and water. Please let me know so we
can start that conversation?
Good news (or bad), we will continue to work closely with your team as we are looking to release 2 more buildings (either
bldg 1 and 2 or 5a and 5b).
Thank you,
CASEY W. DILLON
Vice President, Development Manager
Prologis | Local partner to global trade™
2021 McKinney Avenue, Suite 1050 Dallas, Texas 75201-2237 | United States
Direct +1 972 884-9253 | Mobile +1 469 236 1434 | cdillon@prologis.com
www.prologis.com | Follow us on LinkedIn and Twitter
The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential
and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons
or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the
sender and delete the material from any computer.
2