Loading...
Trade Center-CS170522 Priscilla Martinez From:Marcus Marion Sent:Friday, May 26, 2017 6:56 AM To:Priscilla Martinez Subject:Coppell Trade Center This is a correspondence for the Coppell Trade Center From: George Marshall Sent: Monday, May 22, 2017 1:04 PM To: Darryl Zbranek <dzbranek@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Subject: FW: Coppell Trade Center - Driveway Can we discuss? Thanks, George George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) 469-964-4731 (cell) www.coppelltx.gov From: Dayton \[mailto:daytonm@macatee-engineering.com\] Sent: Monday, May 22, 2017 12:39 PM To: George Marshall <GMarshall@coppelltx.gov> Cc: Katherine Brock <katherineb@macatee-engineering.com>; Michael Garza <MGarza@coppelltx.gov>; knewman@hldallas.com Subject: Coppell Trade Center - Driveway George, Will you please let me know what we have to do to close this project out? We have installed all of the BMP’s specified in the approved plans. I realize we do not have a full stand of grass yet, but the seed will germinate as the weather continues to warm and the frequency of high stream velocities decreases. We understand there will need to be some final cleanup and rock check dam removal when the grass takes hold. In the meantime, I am very concerned about the chasm that is continuing to migrate southward. It is getting very close to the headwall that we recently installed. In addition, the sudden drop is contributing to issues caused by elevated stream velocities during heavy rain events. 1 In my opinion, the two issues discussed above are directly related to each other. Once the erosion issue is corrected and the waterfall is eliminated the resulting backwater should mitigate stream velocities – thereby reducing sediment transport. Please call me at your convenience to discuss this. Thank you, Dayton Macatee Engineering LLC 3519 Miles Street Dallas, Texas 75209 (214) 373-1180 2