Loading...
Security Fire Systems-LR170508 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 REPORT OF FIELD DENSITY TESTS Security Fire Systems 196 S. Freeport Parkway Coppell, Texas REPORTED TO: Security Fire Systems, Inc. 196 Freeport Parkway Coppell, Texas 75019 ATTN: Mr. Mike Alexander REPORT NO. 13 REPORT DATE: 05-24-17 REG PROJECT NO. 21753 TECHNICIAN: J. Castaneda PAGE: 1 of 2 CONTRACTOR: Trest Construction Proctor No. ASTM Standard Description Optimum Moisture, % Maximum Density, PCF 1 D-698 Reddish brown clayey sand w/sandstone 12.2 109.9 2 D-698 Light brown sandy clay 13.5 110.5 3 D-698 Dark brown clayey sand 10.5 117.1 4 D-698 Reddish brown sandy clay 13.5 110.7 5 D-698 Red & light brown clayey sand 11.6 114.0 Test No. Date Location Depth Below Final S. G. (feet) Pocket Pen (tsf) Field Density (pcf) Field Moisture (%) Proctor ID Compaction Level (%) 90 05-08-17 Sanitary Line A: STA 00+60 11.0 3.5 106.3 16.3 2 96.2 91 Sanitary Line A: STA 00+61 10.0 3.75 107.2 15.9 2 97.0 92 Sanitary Line A: STA 00+62 9.0 3.75 106.5 16.1 2 96.4 93 Sanitary Line A: STA 00+63 8.0 3.75 107.8 15.7 2 97.6 94 Sanitary Line A: STA 00+64 7.0 4.0 108.2 16.0 2 97.9 95 Sanitary Line A: STA 00+65 6.0 3.25 105.9 15.5 2 95.8 96 Sanitary Line A: STA 00+66 5.0 3.5 106.5 16.2 2 96.4 97 Sanitary Line A: STA 00+67 4.0 3.75 107.7 14.8 2 97.5 98 Sanitary Line A: STA 00+68 3.0 3.75 108.1 14.9 2 97.8 99 Sanitary Line A: STA 00+69 2.0 3.75 107.5 15.3 2 97.3 REPORT NO. 13 REPORT DATE: 05-24-17 REG PROJECT NO. 21753 PAGE: 2 of 2 Test No. Date Location Depth Below Final S. G. (feet) Pocket Pen (tsf) Field Density (pcf) Field Moisture (%) Proctor ID Compaction Level (%) 100 05-08-17 Sanitary Line A: STA 00+70 1.0 3.75 106.9 16.0 2 96.7 101 Sanitary Line A: STA 00+71 0.0 3.75 107.8 16.1 2 97.6 102 05-09-17 Water Line: STA 3+01 3.0 3.5 106.3 16.0 2 96.2 103 Water Line: STA 3+02 2.0 3.25 105.9 15.9 2 95.8 104 Water Line: STA 3+03 1.0 3.75 108.0 14.9 2 97.7 105 Water Line: STA 3+04 0.0 3.75 107.9 15.5 2 97.6 106 Water Line: STA 2+00 3.0 3.5 106.9 16.0 2 96.7 107 Water Line: STA 2+01 2.0 3.75 107.5 15.0 2 97.3 108 Water Line: STA 2+02 1.0 3.75 107.6 15.2 2 97.4 109 Water Line: STA 2+01 0.0 3.75 108.2 14.9 2 97.9 Comments: Where tested, materials were in compliance with project specifications. E-Mail Distribution: (1) Security Fire Systems, Inc./ Mr. Mike Alexander (1) GPF Architects, LLC/Mr. Greg Frnka (1) Trest Construction/Mr. Gilbert Trevino (1) City of Coppell/Mr. Matthew Mabry (1) Trest Construction/Mr. Clement Wang (1) Trest Construction/Mr. Eric Larsen Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill Woolwine Sr. Manager, CMT BW/mg