PA1501B-DR170524 DAILY CONSTRUCTION REPORT DATE ___05/24/2017___ REPORT #________________ PROJECT: Andrew Brown DAY M T W T F S S PROJECT NO. WEATHER Sunny OWNER CITY of COPPELL TEMP 75 WIND NW 16 CONTRACTOR: CORE HUMIDITY 37 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: West East -Sod is still being installed on the park -The water meter is being adjusted to the proper height -Brick is still being installed -The north and south pavilion are still being worked on -I informed Robert from CORE that the irrigation meters need to be raised -The domestic water meter were installed correctly SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.