PA1501B-DR170601
DAILY CONSTRUCTION REPORT
DATE ___06/01/2017___ REPORT #________________
PROJECT: Andrew Brown
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER CITY of COPPELL
TEMP 72
WIND ESE 5
CONTRACTOR: CORE
HUMIDITY 95
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
West
East
-The sod is still being installed
-CORE start removing the broken pavement in the parking area
-The channel was released. Some of the loose trash and debris will be cleaned
-CORE is still working on the pavilions
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.