Prologis Park 121 Northwest Dr--DR170523
DAILY CONSTRUCTION REPORT
DATE ___05/23/2017__1:00am_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Light
Shower
OWNER Prologis
TEMP 78
CONTRACTOR: Mycon
WIND NW 16
HUMIDITY 56
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Pavecon prepped for the pour on the sidewalk on the south side of the property
-The stamped pavement was washed today
-
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.