Loading...
Prologis Park 121 Northwest Dr--DR170523 DAILY CONSTRUCTION REPORT DATE ___05/23/2017__1:00am_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Light Shower OWNER Prologis TEMP 78 CONTRACTOR: Mycon WIND NW 16 HUMIDITY 56 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Pavecon prepped for the pour on the sidewalk on the south side of the property -The stamped pavement was washed today - SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.