Loading...
CRDC1401-CS170601 DAILY CONSTRUCTION REPORT DATE ___06/01/2017____ REPORT #________________ PROJECT: Denton Tap/Sandy Lake DAY M T W T F S S PROJECT NO. WEATHER Cloudy OWNER CITY of COPPELL TEMP 72 WIND ESE 5 CONTRACTOR: Pavecon 95 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -AALC is still working on the landscaping and irrigation -I sent Michael B. an email with some of the issues with the light pole. Mike informed me that he would send it to ATCI to be repaired. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.