CRDC1401-CS170601
DAILY CONSTRUCTION REPORT
DATE ___06/01/2017____ REPORT #________________
PROJECT: Denton Tap/Sandy Lake
DAY
M T W T F S S
PROJECT NO.
WEATHER Cloudy
OWNER CITY of COPPELL
TEMP 72
WIND ESE 5
CONTRACTOR: Pavecon
95
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-AALC is still working on the landscaping and irrigation
-I sent Michael B. an email with some of the issues with the light pole. Mike informed me that he would send it to ATCI to be repaired.
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.