Prologis Park-DR170522
DAILY CONSTRUCTION REPORT
DATE ___05/22/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER Prologis
TEMP 78
CONTRACTOR: Mycon
WIND ESE 9
HUMIDITY 53%
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-The concrete pour was cancelled
-Because of the poor weather this morning, the pour was rescheduled to Wednesday
-I will inspect the steel for the north side pour tomorrow
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.