Prologis Park-DR170526 DAILY CONSTRUCTION REPORT DATE ___05/26/2017_12:30pm__ REPORT #________________ PROJECT: Building 3 DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER Prologis TEMP 94 CONTRACTOR: Mycon WIND S. 94 51 HUMIDITY PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: -Potter is pouring the rest of the concrete on the north side of Building 3 -I informed Potter that there were still a lot of issues that needed to be resolved -Mycon is still working on the interior of the building SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.