Prologis Park-DR170526
DAILY CONSTRUCTION REPORT
DATE ___05/26/2017_12:30pm__ REPORT #________________
PROJECT: Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Partly
Cloudy
OWNER Prologis
TEMP 94
CONTRACTOR: Mycon
WIND S. 94
51
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
-Potter is pouring the rest of the concrete on the north side of Building 3
-I informed Potter that there were still a lot of issues that needed to be resolved
-Mycon is still working on the interior of the building
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.