Loading...
Vista Ridge Lot 6 D-LR170530 ASC Coppell 731 Plaza Boulevard, Coppell, TX75019 5/30/2017 8 am to 9 am Jose Mondragon Project Superintendent Phone: (940) 783 2295 email: jmondragon@linksconstruction.biz .Earth work are almost Eess. The building pad is almost finished complete. UTILITIES workare in process. x x 3 pm 1/2" 45 min x 85 F x x 5/30/2017 Jose Mondragon x x N/A x x x x x Dumpster Construction it is not covered x x x x