Loading...
ST9304- CS950110 MEMORANDUM To: Jim Witt, City Manager From: Kenneth M. Griffin, P.E., Asst. City Manager/Dir. Public Works RE: Consideration to authorize Dallas County to include sidewalks on the Beltline Road bridge over Grapevine Springs (ST 93-04). Date: January 10, 1995 Upon review of the conceptual plans for Beltline Road, I noted that Dallas County was not providing for sidewalks on the Beltline Road bridge over Grapevine Springs. Upon discussion with Dallas County, I was informed that the County does not fund sidewalks as part of their construction project. If the City desires to pursue the construction of sidewalks on the bridge, there will be an additional cost to the City. The County has provided an estimate showing the estimated construction cost for a 5 foot sidewalk on both sides of the bridge to be $110,000.00. The inclusion of sidewalks along Beltline Road would have questionable benefit because of the commercial nature of the property and the large portion of the land which is owned and operated by the Northlake Power Plant. You may also recall that there is currently a proposal to include a trail adjacent to the DART Railroad Line. It is my recommendation that we inform Dallas County to not include sidewalks on the bridge. If you concur please let me know so I can inform Dallas County as soon as possible.