DFW Airport-LR170608
REINFORCING STEEL OBSERVATIONS REPORT
Report Number:94161360.1024
Service Date:06/08/178901 Carpenter Fwy Ste 100
Report Date:06/18/17 Dallas, TX 75247-4547
214-630-1010 Reg No: F-3272
ClientProject
Logistics Center II LLCLogistics Center II
Attn: Pat Perot2601 West Bethel Rd
5430 LBJ Fwy Ste 1200DFW Permit #A16-005
Dallas, TX 75240DFW Airport, TX 75261
Project Number: 94161360
PROJECT DATA
Drawings Utilized:Sheets/Details: C7.05
Locations/Items Observed:Pavement, turn lane at center of Bethel Drive
Test Method:Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVEDCORRECTINCORRECTITEMS OBSERVEDCORRECTINCORRECT ITEMS OBSERVEDCORRECTINCORRECT
Placing Drawings
Bar Length and ShapeColumn Tie Spacing & Type
XX
Approved
Bar SizeProper Bar PlacementStirrup Spacing & Type
XX
Bar GradeProperly TiedWelded Splices
XX
Rebar CleanDowel Bars in PlaceMechanical Splices
XX
Trash & Debris Removed Proper Bar SupportsLapped Splices
XXX
Number of Bars Proper Cover/Clearance
XX
Discrepancies/Comments:
No discrepancies were noted at the time of this observation.
Services: Reinforcing steel (rebar) placement observation.
Terracon Rep.: Kaleb Womack
Reported To:
Contractor:Hillwood Construction
Report Distribution:
See attached distribution list.
Reviewed By:____________________________________
David A. Belcher, P.E.
Senior Project Materials Engineer
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
R940003, 04-24-17, Rev.1 Page 1 of 1
!"# $%&'(%")&*+'" &%,"'
! "#"$
!"#+,-.!&
'!()*#$%"&" %"&%'&"()*+,-./-+(012(3/-(""
" %&%'4*55*67(89(':$';:'
!"#$%"&
$; !";""
/%01&
-./01.230.45%(./0
<=(>?@A6/AB6()-./-+(CC(>>)7(D*/(D-+?/
<=(E+?1F-+(G(>-@HAI*J?.(*.F(K66?BA*/-6(C.B7(K5,-+(LHB5H
<=(E+?1F-+(G(>-@HAI*J?.(*.F(K66?BA*/-6(C.B7(M*+/A.(NB?.
<=(E+?1F-+(G(>-@HAI*J?.(*.F(K66?BA*/-6(C.B7(O*BP(QPA/-
<=()5ABR(3/+HB/H+*5(S.@A.--+A.@7(T*B?U()5ABR
<=()5ABR(3/+HB/H+*5(S.@A.--+A.@7(T-66-(4-(>*()+HI
<=(40Q(C./-+.*/A?.*5(KA+,?+/7(4*J?.(V*55
<=(40Q(C./-+.*/A?.*5(KA+,?+/7(W*+-6P(3P*P*.A
<=(40Q(C./-+.*/A?.*5(KA+,?+/7(XABP*+F(N566?.
<=(40Q(C./-+.*/A?.*5(KA+,?+/7(X?U-+/(X?F+A@H-I
<=(V*5YY(K66?BA*/-6(C.B7(4*ZAF(>A//5-/?.
<=(V*5YY(K66?BA*/-6(C.B7(4-+-R(4?1.6
<=(V*5YY(K66?BA*/-6(C.B7(VH./-+(3/*+R-2
<=(V*5YY(K66?BA*/-6(C.B7(T?P.(M*A.
<=(VA551??F()?.6/+HB/A?.(3-+ZAB-67(E+HB-(V*++A6
<=(VA551??F()?.6/+HB/A?.(3-+ZAB-67(V*.6(E*H-+
<=(VA551??F()?.6/+HB/A?.(3-+ZAB-67(T-YY(8*/-
<=(VA551??F()?.6/+HB/A?.(3-+ZAB-67(T?P.(3P*1
<=(VA551??F()?.6/+HB/A?.(3-+ZAB-67(X*PJ*.(M?JA.
<=(VA551??F(C.Z-6/J-./(D+?,-+/A-67(C.B7(\[-++2(X?-/I-5
<=(M*B@+-@?+(K66?B(K+BPA/-B/67()5*2(DPA,,6
<=(M*B@+-@?+(K66?B(K+BPA/-B/67(XABP*+F(>-?.*+F
<=(3/+HB/H+*5(3-+ZAB-6(C.B7(XABR(3JA/P