Loading...
9th Grade Center-LR170615 (3)R9400001 11-21-16 Rev.16 Page 1 of 2 FOUNDATION OBSERVATIONS REPORT Report Number:94171164.0039 Service Date: 06/15/17 8901 Carpenter Fwy Ste 100 Report Date:06/21/17 Dallas, TX 75247-4547 Task:214-630-1010 Reg No: F-3272 Client Project Coppell ISD Coppell ISD 9th Grade Center Attn: Louis Macias 1301 Wrangler Circle 1303 Wrangler Cir Coppell, TX 75019 Coppell, TX 75019 Project No.94171164 Pier Identification 1360 1310 1317 1366 1331 1367 1365 Required Pier Diameter (in.)24 18 18 18 18 18 18 Required Penetration (ft.)10.0 10.0 10.0 10.0 10.0 10.0 10.0 Depth to Top of Bearing Stratum from Ground (ft.)33.1 38.5 32.0 31.2 32.1 28.2 30.0 Depth to Bottom of Pier from Ground Surface (ft.)44.1 48.7 42.4 41.3 42.1 38.2 40.3 Actual Penetration (ft.)11.0 10.2 10.4 10.1 10.0 10.0 10.3 Casing Outside Diameter (in.) 26 20 20 20 20 20 20 Depth to Bottom of Casing (ft.)33.0 35.0 31.0 31.0 31.0 28.0 29.0 Condition of Bottom (wet or dry)Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no)Yes Yes Yes Yes Yes Yes Yes Number of Vertical Bars (ea.)6 5 5 5 5 5 5 Reinforcing Bar Size (#)6 6 6 6 6 6 6 Time Drilling was Completed 0834 0958 1015 1000 1106 0951 1250 Time Concrete Placement was Completed 1039 1153 1219 1121 1321 1100 1506 Distance from Ground to Top of Concrete (ft.)0.6 -0.2 1.2 -0.2 1.2 -0.2 -0.2 Total Length of Concrete Pier (ft.)44.7 48.5 43.6 41.1 43.3 38.0 40.1 Top of Ground Elevation (ft.)N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.)N/A N/A N/A N/A N/A N/A N/A COMMENTS: BEARING MATERIAL:Gray shale DRILLING CONTRACTOR:Wylie Drilling Services:Drilled pier observation. Terracon Rep:Jason Carrizales Reported To: Contractor:Northstar Builders Group, LLC Lunch/NC: Report Distribution (1) Coppell ISD, Louis Macias (1) Corgan Associates Inc, Keith Cummins(1) Glenn Engineering, Robert Howman (1) Northstar Builders Group, Charles Posey Reviewed By:____________________________________ (1) Northstar Builders Group, Jeff Miller (1) Northstar Builders Group, Justin Dunkin Daniel Wood (1) Northstar Builders Group, Roberto Gonzalez (1) Sizelove Construction, Nathan Hayward Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. R9400001 11-21-16 Rev.16 Page 2 of 2 FOUNDATION OBSERVATIONS REPORT Report Number:94171164.0039 Service Date: 06/15/17 8901 Carpenter Fwy Ste 100 Report Date:06/21/17 Dallas, TX 75247-4547 Task:214-630-1010 Reg No: F-3272 Client Project Coppell ISD Coppell ISD 9th Grade Center Attn: Louis Macias 1301 Wrangler Circle 1303 Wrangler Cir Coppell, TX 75019 Coppell, TX 75019 Project No.94171164 Pier Identification 1323 1328 1364 1330 1362 Required Pier Diameter (in.)18 18 18 18 18 Required Penetration (ft.)10.0 10.0 10.0 10.0 10.0 Depth to Top of Bearing Stratum from Ground (ft.)31.5 31.0 31.0 29.0 30.9 Depth to Bottom of Pier from Ground Surface (ft.)41.7 41.5 41.2 39.8 41.0 Actual Penetration (ft.)10.2 10.5 10.2 10.8 10.1 Casing Outside Diameter (in.) 20 20 20 20 20 Depth to Bottom of Casing (ft.)31.0 31.0 31.0 27.6 29.4 Condition of Bottom (wet or dry)Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no)Yes Yes Yes Yes Yes Number of Vertical Bars (ea.)5 5 5 5 5 Reinforcing Bar Size (#)6 6 6 6 6 Time Drilling was Completed 1230 1430 1606 1402 1622 Time Concrete Placement was Completed 1338 1547 1643 1533 1706 Distance from Ground to Top of Concrete (ft.)1.2 1.2 -0.2 1.2 -0.2 Total Length of Concrete Pier (ft.)42.9 42.7 41.0 41.0 40.8 Top of Ground Elevation (ft.)N/A N/A N/A N/A N/A Top of Pier Elevation (ft.)N/A N/A N/A N/A N/A COMMENTS: BEARING MATERIAL:Gray shale DRILLING CONTRACTOR:Wylie Drilling Services:Drilled pier observation. Terracon Rep:Jason Carrizales Reported To: Contractor:Northstar Builders Group, LLC Lunch/NC: Report Distribution (1) Coppell ISD, Louis Macias (1) Corgan Associates Inc, Keith Cummins(1) Glenn Engineering, Robert Howman (1) Northstar Builders Group, Charles Posey Reviewed By:____________________________________ (1) Northstar Builders Group, Jeff Miller (1) Northstar Builders Group, Justin Dunkin Daniel Wood (1) Northstar Builders Group, Roberto Gonzalez (1) Sizelove Construction, Nathan Hayward Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.