Loading...
Freeport NIP(2.3)-LR 960626 (2)TECHNOLOGIES INC Maxim Tech. ,Southwestern Labs 2200 Gravel Drive Fort Worth, Texas 76118-7123 Telephone: (817) 284-7755 FAX: {817) 589-1420 CLIENT: PROJECT: SERVICES: REPORT OF CONCRETE COMPRESSIVE STRENGTH Larry Jackson Construction Co. 5112 Sun Valley Fort Worth, TX 76119 PROJECT NO.: 1103601210 REPORT NO.: 602611 City of Coppell DATE OF SERVICE: 5/29/96 440 Royal Lane AUTHORIZATION: REPORT DATE: 6/26/96 Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. PROJECT DATA CONTRACTOR: Larry Jackson Construction Co. CONCRETE SUPPLIER: TXI PLANT: NO. 41 SPECIFICATION REQUIREMENTS STRENGTH: 3000psi @ 28 DAYS SLUMP: 3 . 5" AIR: N/G METHOD OF TEST: ASTM C-31 & C-39 ASTM C-143 CLASS OF CONCRETE: 8272 5 SK DATE OF PLACEMENT: 5/29/96 TIME SAMPLED: 12:55PM BY: Scott Berry TEMPERATURE {°F) - AIR: 90 CONCRETE: 89 TRUCK NO: 454 TICKET NO: 599157 AIR CONTENT(%): 4.5 LOCATION OF PLACEMENT: Top of "Y" inlet, by fence REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM MARKED SLUMP DATE AGE DIAMETER AREA LOAD SET NO. (inchesI TESTED {days) (in.) {sq.in.) {lbs. force) 1 1 3.75 6/17/96 19 6.00 28.27 103410 1 2 3.75 6/17/96 19 6.00 28.27 102900 1 3 3.75 6/26/96 28 6.00 28.27 111090 1 4 3.75 6/26/96 28 6.00 28.27 110830 COMPRESSIVE STRENGTH (psi) 3660 3640 3930 3920 REMARKS Technician: Scott Berry Technician Started: 12:00PM Stopped: 01:30PM Report Distribution: MAXIM TECH. · SOUTHWESTERN LABS (2) Larry Jackson Construction Co. (1) City of Coppe[[ ~ -! Tim Begole, CET. Office Manager 1 O01 TLM Our letters end reports are for the exclusive use of the client to whom they ere sddreued and shall not be reproduced except in full without the approval of tho testing laboratory. The use of ourname must receive our wr tten approve Our ettere end report~ apply only to the sample teated and/or inspected, and are net indicative of the quantities of apparently identical or similar products.