Loading...
Fairfield Inn-LR170530CONCRETE COMPRESSIVE STRENGTH TEST REPORT Report Number: 94161112.0075 ��rr�con Service Date: 05/30/17 8901 Carpenter Fwy Ste 100 Report Date: 06/29/17 Revision 1 - 28 -day results Dallas, TX 75247-4547 Task: Diam. 214-630-1010 Re No:F-3272 Client Test Project Strength Northpoint Construction No. ID Fairfield Inn - Coppell TX (sq in) Received Attn: Dilip Pranav (days) Northpoint Dr at SI -I 121 (psi) 8530 Esters Blvd 1 I Coppell, TX 12.57 Irving, TX 75063 7 30,250 2,410 1 1 2 Project Number: 94161112 12.57 Material Information 28 Sample Information 3,250 Specified Strength: 3,000 psi @ 28 days Sample Date: 05/30/17 Sample Time: 1420 06/27/17 28 Sampled By: Cosmin Panoiu Mix ID: 4703 1 4 Weather Conditions: Sunny, small winds Supplier: Charley's 28 Accumulative Yards: 4/4 Batch Size (cy): 4 Batch Time: 1337 Plant: 130790 Placement Method: Direct Discharge Truck No.: 972 Ticket No.: 166627 Water Added Before (gal): 0 Field Test Data 4.00 Water Added After (gal): 0 56 Sample Location: See Placement Location Test Result Specification Placement Location: Canopy Piers @ 0/10.4, 0/8.4, Slump (in): 5 3-5 P/10.4, & P/8A Air Content (%): 1.4 0-3 Concrete Temp, (F): 85 Ambient Temp. (F): 89 Plastic Unit Wt. (Pei): 150.4 Yield (Cu. Yds.): Laboratory Test Data Age at Maximum Compressive Set Specimen Avg Diam. Area Date Date Test Load Strength Fracture No. ID (in) (sq in) Received Tested (days) (lbs) (psi) Type 1 I 4.00 12.57 06/06/17 7 30,250 2,410 1 1 2 4.00 12.57 06/27/17 28 40,850 3,250 1 1 3 4.00 12.57 06/27/17 28 37,750 3,000 2 1 4 4.00 12.57 06/27/17 28 39,420 3,140 5 Average (28 days) 3,130 1 5 4.00 12.57 07/25/17 56 Comments: Average compressive strength of 28 day cylinders complies with the specified strength Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Cosmin Panoiu Reported To: Contractor: Report Distribution: T (1) Northpoint Construction, Dilip Prenav (1) Kenenrkey Interests LLC, Jeremy Henicke Reviewed By: � (1)Northpoint Construction, JamieOeden Senior Project Materials Engineer Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client Indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or Identical materials. CR0001, II-16-12,Rcv.6 Page I of 1 CONCRETE COMPRESSIVE STRENGTH TEST REPORT 1 ��rr�con Report Number: 94161112.0077 Service Date: 05/31/17 8901 Carpenter Fwy Ste 100 Report Date: 06/30/17 Revision 1 - 28 -day results Dallas, TX 75247-4547 Task: 214-630-1010 Reg No:F-3272 Client Project Northpoint Construction Attn: Dilip Pranav 8530 Esters Blvd Irving, TX 75063 Material Information Specified Strength: 3,000 psi @ 28 days Mix ID: 55K Supplier: Charley's Batch Time: 1359 Truck No,: 1318 Field Test Data Test Slump (in): Air Content (%): Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (fico: Yield (Cu. Yds.): Plant: Avg Diam. Ticket No.: 545414 Result Specification 4 1/2 4-6 0.9 0-3 81 55-95 79 46,895 152.5 (28 days) Laboratory Test Data Set Specimen Avg Diam. No. ID (in) I 1 4.00 I 2 4.00 1 3 4.00 1 4 4.00 Fairfield Inn - Coppell TX Northpoint Dr at SH 121 Coppell, TX Prosect Number: 94161112 Sample Information Sample Date: Sampled By: Weather Conditions: Accumulative Yards: Placement Method: Water Added Before (gal): Water Added After (gal): Sample Location: Placement Location: Area Date Date (sq in) Received Tested 12.57 06/07/17 12.57 06/28/17 12.57 06/28/17 12.57 06/28/17 12.57 07/26/17 05/31/17 Sample Time: 1505 Andrew Morales Sunny 10/10 Batch Size (cy): 10 Chute 0 See Placement Location Light Poles 1-8 Age at Maximum Test Load (days) (lbs) 7 35,580 28 45,510 28 44,005 28 46,895 Average (28 days) 56 Comments: Average compressive strength of 28 day cylinders complies with the specified strength. Compressive Strength Fracture (psi) Type 2,830 2 3,620 5 3,500 5 3,730 1 3,620 Samples Made By: Terracon Services: Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples. Terracon Rep.: Andrew Morales Reported To: Contractor: Report Distribution: (1) Northpoint Construction, Dilip Pranav (1) Komarkcy Interests LLC, Jeremy Henickc Reviewed By: (1) Northpoint Construction, Jamie Ogden Senior Project Materials Engineer Test Methods: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231 The tests were performed In general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily Indicative of the properties of other apparently similar or identical materials. CRUUUI, 11-16-12, Rev.6 Page I of 1