9th Grade Center-LR170621 (4)REINFORCING STEEL OBSERVATIONS REPORT
Report Number:94171164.0050
Service Date:06/21/17 8901 Carpenter Fwy Ste 100
Report Date:06/26/17 Dallas, TX 75247-4547
214-630-1010 Reg No: F-3272
Client Project
Coppell ISD Coppell ISD 9th Grade Center
Attn: Louis Macias 1301 Wrangler Circle
1303 Wrangler Cir Coppell, TX 75019
Coppell, TX 75019
Project Number: 94171164
Services: Reinforcing steel (rebar) placement observation.
Terracon Rep.: Jason Carrizales
Reported To:
Contractor:Northstar Builders Group, LLC
Report Distribution:
(1) Coppell ISD, Louis Macias (1) Corgan Associates Inc, Keith
Cummins(1) Glenn Engineering, Robert Howman (1) Northstar Builders Group, Charles
Posey Reviewed By:____________________________________
(1) Northstar Builders Group, Jeff Miller (1) Northstar Builders Group, Justin
Dunkin Daniel Wood
(1) Northstar Builders Group, Roberto
Gonzalez
(1) Sizelove Construction, Nathan
Hayward Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
R940003, 04-24-17, Rev.1 Page 1 of 1 dka
PROJECT DATA
Drawings Utilized:Sheets/Details: S03-11, S03-12, & S03-13/See sketch for details on Grade Beam, dated 03/03/17
Locations/Items Observed:Area 2, Grade Beam, see attached sketch
Test Method:Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings
Approved X Bar Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Bar Placement X Stirrup Spacing & Type X
Bar Grade X Properly Tied X Welded Splices
Rebar Clean X Dowel Bars in Place X Mechanical Splices
Trash & Debris Removed X Proper Bar Supports X Lapped Splices X
Number of Bars X Proper Cover/Clearance X
Discrepancies/Comments:
No discrepancies were noted at the time of this observation.