9th Grade Center-LR170622 (3)R9400001 11-21-16 Rev.16 Page 1 of 2 FOUNDATION OBSERVATIONS REPORT Report Number:94171164.0052 Service Date: 06/22/17 8901 Carpenter Fwy Ste 100 Report Date:06/28/17 Dallas, TX 75247-4547 Task:214-630-1010 Reg No: F-3272 Client Project Coppell ISD Coppell ISD 9th Grade Center Attn: Louis Macias 1301 Wrangler Circle 1303 Wrangler Cir Coppell, TX 75019 Coppell, TX 75019 Project No.94171164 Pier Identification 1309 1308 1319 1320 1354 906 1307 Required Pier Diameter (in.)18 18 18 18 18 24 24 Required Penetration (ft.)10.0 10.0 10.0 10.0 10.0 10.0 10.0 Depth to Top of Bearing Stratum from Ground (ft.)30.2 31.3 30.5 30.6 31.2 35.8 36.1 Depth to Bottom of Pier from Ground Surface (ft.)41.2 43.4 41.6 41.5 43.2 46.0 47.1 Actual Penetration (ft.)11.0 12.1 11.1 10.9 12.0 10.2 11.0 Casing Outside Diameter (in.) 20 20 20 20 20 26 26 Depth to Bottom of Casing (ft.)30.0 30.0 30.0 30.0 30.0 35.0 35.0 Condition of Bottom (wet or dry)Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no)Yes Yes Yes Yes Yes Yes Yes Number of Vertical Bars (ea.)5 5 5 5 5 6 6 Reinforcing Bar Size (#)6 6 6 6 6 6 6 Time Drilling was Completed 0854 0920 0831 0840 1017 1042 1118 Time Concrete Placement was Completed 1151 1200 1100 1114 1200 1225 1245 Distance from Ground to Top of Concrete (ft.)-2.0 -2.0 2.0 2.0 -2.0 -1.0 -1.0 Total Length of Concrete Pier (ft.)39.2 41.4 43.6 43.5 41.2 45.0 46.1 Top of Ground Elevation (ft.)N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.)N/A N/A N/A N/A N/A N/A N/A COMMENTS: Gray shaleBEARING MATERIAL: DRILLING CONTRACTOR:Wylie Drilling Services:Drilled pier observation. Terracon Rep:Tyrece Lewis Reported To:Robert w/Northstar Builders Contractor:Northstar Builders Group, LLC Lunch/NC: Report Distribution (1) Coppell ISD, Louis Macias (1) Corgan Associates Inc, Keith Cummins(1) Glenn Engineering, Robert Howman (1) Northstar Builders Group, Charles Posey Reviewed By:____________________________________ (1) Northstar Builders Group, Jeff Miller (1) Northstar Builders Group, Justin Dunkin Daniel Wood (1) Northstar Builders Group, Roberto Gonzalez (1) Sizelove Construction, Nathan Hayward Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. R9400001 11-21-16 Rev.16 Page 2 of 2 FOUNDATION OBSERVATIONS REPORT Report Number:94171164.0052 Service Date: 06/22/17 8901 Carpenter Fwy Ste 100 Report Date:06/28/17 Dallas, TX 75247-4547 Task:214-630-1010 Reg No: F-3272 Client Project Coppell ISD Coppell ISD 9th Grade Center Attn: Louis Macias 1301 Wrangler Circle 1303 Wrangler Cir Coppell, TX 75019 Coppell, TX 75019 Project No.94171164 Pier Identification 1296 1297 1298 1203 1204 1327 Required Pier Diameter (in.)24 24 24 24 24 18 Required Penetration (ft.)10.0 10.0 10.0 10.0 10.0 10.0 Depth to Top of Bearing Stratum from Ground (ft.)33.0 35.3 34.6 27.8 29.9 30.2 Depth to Bottom of Pier from Ground Surface (ft.)43.2 46.0 45.9 38.0 39.9 40.5 Actual Penetration (ft.)10.2 10.7 11.3 10.2 10.0 10.3 Casing Outside Diameter (in.) 26 26 26 26 26 20 Depth to Bottom of Casing (ft.)35.0 35.0 35.0 35.0 35.0 30.0 Condition of Bottom (wet or dry)Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no)Yes Yes Yes Yes Yes Yes Number of Vertical Bars (ea.)6 6 6 6 6 5 Reinforcing Bar Size (#)6 6 6 6 6 6 Time Drilling was Completed 1147 1207 1225 1239 1310 1420 Time Concrete Placement was Completed 1439 1445 1500 1603 1613 1640 Distance from Ground to Top of Concrete (ft.)-1.0 -1.0 -1.0 1.0 1.0 1.0 Total Length of Concrete Pier (ft.)42.2 45.0 44.9 39.0 40.9 41.5 *Top of Ground Elevation (ft.)N/A N/A N/A N/A N/A N/A *Top of Pier Elevation (ft.)N/A N/A N/A N/A N/A N/A *Elevation was provided by others. COMMENTS: XXX Gray shaleBEARING MATERIAL: DRILLING CONTRACTOR:Wylie Drilling Services:Drilled pier observation. Terracon Rep:Tyrece Lewis Reported To:Robert w/Northstar Builders Contractor:Northstar Builders Group, LLC Lunch/NC: Report Distribution (1) Coppell ISD, Louis Macias (1) Corgan Associates Inc, Keith Cummins(1) Glenn Engineering, Robert Howman (1) Northstar Builders Group, Charles Posey Reviewed By:____________________________________ (1) Northstar Builders Group, Jeff Miller (1) Northstar Builders Group, Justin Dunkin Daniel Wood (1) Northstar Builders Group, Roberto Gonzalez (1) Sizelove Construction, Nathan Hayward Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.