9th Grade Center-LR170628FOUNDATION OBSERVATIONS REPORT
Report Number:94171164.0062
Service Date:06/28/17 8901 Carpenter Fwy Ste 100
Report Date:07/03/17 Dallas, TX 75247-4547
214-630-1010 Reg No: F-3272
Client Project
Coppell ISD Coppell ISD 9th Grade Center
Attn: Louis Macias 1301 Wrangler Circle
1303 Wrangler Cir Coppell, TX 75019
Coppell, TX 75019
Project Number: 94171164
Services: Drilled pier observation.
Terracon Rep.: Jason Carrizales
Reported To:
Contractor:Northstar Builders Group, LLC
Report Distribution:
(1) Coppell ISD, Louis Macias (1) Corgan Associates Inc, Keith Cummins
(1) Glenn Engineering, Robert Howman (1) Northstar Builders Group, Charles
Posey Reviewed By:____________________________________
(1) Northstar Builders Group, Jeff Miller (1) Northstar Builders Group, Justin
Dunkin Daniel Wood
(1) Northstar Builders Group, Roberto
Gonzalez
(1) Sizelove Construction, Nathan
Hayward Project Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
BC0001, 10-16-13, Rev.10 Page 1 of 1 dka
On this date, Terracon's representative arrived at the above referenced job site as scheduled for foundation observation. After arriving at
the job site, Terracon's representative was notified that the scheduled foundation observation was cancelled on-site due to drill not being
ready.