Loading...
9th Grade Center-LR170628FOUNDATION OBSERVATIONS REPORT Report Number:94171164.0062 Service Date:06/28/17 8901 Carpenter Fwy Ste 100 Report Date:07/03/17 Dallas, TX 75247-4547 214-630-1010 Reg No: F-3272 Client Project Coppell ISD Coppell ISD 9th Grade Center Attn: Louis Macias 1301 Wrangler Circle 1303 Wrangler Cir Coppell, TX 75019 Coppell, TX 75019 Project Number: 94171164 Services: Drilled pier observation. Terracon Rep.: Jason Carrizales Reported To: Contractor:Northstar Builders Group, LLC Report Distribution: (1) Coppell ISD, Louis Macias (1) Corgan Associates Inc, Keith Cummins (1) Glenn Engineering, Robert Howman (1) Northstar Builders Group, Charles Posey Reviewed By:____________________________________ (1) Northstar Builders Group, Jeff Miller (1) Northstar Builders Group, Justin Dunkin Daniel Wood (1) Northstar Builders Group, Roberto Gonzalez (1) Sizelove Construction, Nathan Hayward Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. BC0001, 10-16-13, Rev.10 Page 1 of 1 dka On this date, Terracon's representative arrived at the above referenced job site as scheduled for foundation observation. After arriving at the job site, Terracon's representative was notified that the scheduled foundation observation was cancelled on-site due to drill not being ready.