Westhaven Phase 2B-LR170711American Rehab & Inspections
P.O. Box 59192 Dallas, Tx. 75229
Phone (972) 488-3042 ! Cell (214) 536-2915
Created with the SM R� report generator Back
Project
Project Name
Westhaven Phase -2B
Location
Lot
(Laterals)
Date
7/11/2017
Direction Of Survey
Downstream
City
Coppell
PO Number
Run Number
Purpose
Pre -Acceptance
Operator Name
Jesus Escudero
Completed
Yes
Comments
Pipe
Asset ID
Block E
Pipe Size
4"
Pipe Material
Polyvinyl Chloride
Pipe Shape
Circular
Lining Method
Total Length
Length Surveyed
47.3
Year Laid
Year Renewed
Sewer Use
Sanitary
Manhole
Upstream MH
Number
Lot 17
Upstream MH Depth
UpstreamMH
Location
Upstream MH Notes
Downstream MH
Main
Downstream MH
Number
Depth
Downstream MH
Downstream MH
Location
Notes
Amount of Flow
Signs Of Surcharge
No
Other
Media Number
Truck Number
Van 2012
Contractor Name
Cullum
Weather
VCR Start Index
VCR End Index
Created with the SM R� report generator Back
Project Name: Westhaven Phase -2B (Laterals) I Severity
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -17 Moderate
Length Surveyed: 47.5
Downstream MH Number: MainAvprage
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride Severe
ID Number: Lot -17
(1.3) - Begin survey
(47.3) - End Survey ....-
Total Distance: 47.5 (illi ID Number: Main
Created with the -W;3E35► Q� report generator Back
Project Name: Westhaven Phase -213 (Laterals) Severity
Date: 7/11/2017 Asset ID: Block E •
Location: Lot Upstream MH Number: Lot -18
Average
Length Surveyed: 48.5 Downstream MH Number: Main
Run Number: Direction Of Survey: Downstream Severe
Pipe Size: 4" Pipe Material: Polyvinyl Chloride
ID Number: Lot -18
(1.0) - Begin survey •••
(48.4) - End Survey ...
Total Distance: 48.5 f'"A ID Number: Main
Created with the -WPOSM 111L report generator Back
Project Name: Westhaven Phase -26 (Laterals)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -19
Length Surveyed: 47.7
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
-" Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -19
(1.0) - Begin survey
(45.7) - End Survey
Total Distance: 47.7 f'd&) ID Number: Main
Created with the ;2E3sr i Rreport generator Back
Project Dame: Westhaven Phase -2B (Laterals)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -20
Length Surveyed: 45.7
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -20
(1.1) - Begin survey •••
(47.9) - End Survey -
Total Distance: 45.7 ("l ID Number: Main
Created with the ;" s �& report generator Back
Project Name: Westhaven Phase -213 (Laterals)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -21
Length Surveyed: 46.3
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -21
(1.0) - Begin survey ••.••
(46.3) - End Survey .•••
Total Distance: 46.3 ID Number: Main
Created with the OS I& report generator Back
Project Name: Westhaven Phase -213 (Laterals) I Severity
Date: 7/11/2017
I
Asset ID: Block E Light
Location: Lot
Upstream MH Number: Lot -22 Moderate
Length Surveyed: 46.3
Downstream MH Number: Main Average
Run Number:
Direction Of Survey: Downstream
-' Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -22
(1.0) - Begin survey
(47.9) - End Survey .....
Total Distance: 46.3 ra)) ID Number: Main
Created with the 11� report generator Back
Project Name: Westhaven Phase -213 (Laterals) Severity
Date: 7/11/2017 Asset ID: Block E Light
Location: Lot Upstream MH Number: Lot -23 Moderate
Length Surveyed: 48.8 Downstream MH Number: Main
Run Number: Direction Of Survey: Downstream
Pipe Size: 4" Pipe Material: Polyvinyl Chloride
ID Number: Lot -23
(1.0) - Begin survey ...
(48.6) - End Survey
Total Distance: 48.8 (n) ID Number: Main
Created with the ;'sql� report generator ' Back
Project Name: Westhaven Phase -2B (Laterals)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -24
Length Surveyed: 48.6
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -24
(1.0) - Begin survey ...
(46.5) - End Survey ...
Total Distance: 48.6 rft--)) ID Number: Main
Created with the O � report generator Back
Project Name: Westhaven Phase -2B (Laterals)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -25
Length Surveyed: 46.1
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -25
(1.0) - Begin survey •..
(46.1) - End Survey
Total Distance: 46.1 ha -N ID Number: Main
Created with the Q� report generator Back
Project Name: Westhaven Phase -213 (Laterals)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -26
Length Surveyed: 46.1
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -26
(1.0) - Begin survey
(47.2) - End Survey
Total Distance: 46.1 fnl ID Number: Main
Created with the I& report generator Back
Project Name: Westhaven Phase -213 (Laterals)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -27
Length Surveyed: 47.2
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -27
(1.4) - Begin survey
(44.7) - End Survey .••••
Total Distance: 47.2 ral ID Number: Main
Created with the _WPOSM ''SIJ report generator Back
Project Name: Westhaven Phase -2B (Lateral's)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -28
Length Surveyed: 47.6
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -28
(1.0) - Begin survey •..
(47.6) - End Survey •..
Total Distance: 47.6 ID Number: Main
Created with the PUS `TI report generator Back
Project Name: Westhaven Phase -2B (Laterals) Severity
Date: 7/11/2017
Asset ID: Block E Light
Location: Lot
Upstream MH Number: Lot -29 Moderate
Length Surveyed: 47.6
Downstream MH Number: Main erage
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -29
(1.0) - Begin survey •••
(48.0) - End Survey
Total Distance: 47.6 (') ID Number: Main
Created with the ;3"� report generator Back
Project Name: Westhaven Phase -2B (Laterals)
Date: 7/11/2017
Asset ID: Block E
Location: Lot
Upstream MH Number: Lot -30
Length Surveyed: 48
Downstream MH Number: Main
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
(1.0) - Begin survey
(44.9) - End Survey
Total Distance: 48
ID Number: Lot -30
ID Number: Main
Created with the P Q� report generator Back
Project Name: Westhaven Phase -213 (Laterals) I Severity
Date: 7/11/2017
Asset ID: Block E Light
Location: Lot
Upstream MH Number: Lot -31
Length Surveyed: 47.4
Downstream MH Number: Main verage
Run Number:
Direction Of Survey: Downstream
Pipe Size: 4"
Pipe Material: Polyvinyl Chloride
ID Number: Lot -31
(1.0) - Begin survey •••..
(47.4) - End Survey •....
Total Distance: 47.4 I &A ID Number: Main
Created with the . 1� report generator Back