Loading...
WA9302-CS 970709 ~7/~9/1997 16:28 214-~1-82~4 07/09/9T u'ED 15:~8 F~ ' ~ ~,,, SHIMEK,J~C~BS~,fNKLE PAGE 82/82 NATGUN I' REFERR El ) [rco',S~. Concrete T~ks July 9, 1997 ~:t.zve~ %~t baa V,'ak~Rc~d, MA 01880-119Z ','~k~phcne 617-Z46-[[33 }':~x 61%245-3279 Fa¢simile Number: 214-381-0204 Mr. Gary Hendricks Shimek, Jacobs, & Finklee 833~ Douglss Avenue Suite 820 Dallas, TX 75225 Reference: 6.0 MG Water Storage Tank Coppell. Texas Dear Gary: The hydroseeding was applied to the project site on June26, 1997. Based on conversations with our subcontractor, Palm, this application we~ ~opefiy aDplied. Altho~gh normal germination is in seven to ten days, cool nights and cloudy days which the Dallas area has experienced can delay this germ;n~icn period. Palm does plan to inspect the site tomorrow at 7:30 ~.m. end re-~ppZ~ hy~roseed te areas that did not take. The current sGhedule of I;~hL; watering ~hme ~m,~s ~ day with the sprinkler system is appropriate and imDo~ant fo~ {osteri~g grass ~ew~. Palm will monitor the g~ass gro~h to determine i? {~h~r action w;~l ~ fi¢ce~5a~. Sincerely, Anthony L. DiGiovanni. P.E. Construction Manager ALDM) h $O~JTl<vts't On'let Suite 81I, 811.1. PN~tort l~ad, D=Itms. T",'.Z 75ZZ5,5316. Telcpt~c:',.- ~1'b368-3306 MztnvEsT O~z¢,,: $uiee ;~11, 2610 Sheridirm ~q, oad. ZioL !7. 6;):~99-a6i5, T¢lcpho>u: :!;'- 7-87!-8806 Mm-A'rI.^renc OnqcE Suite 2A, 4500 Bl=¢k P,z)ck l~ad. Ha.m.~s~ead, MD 2t074, Tci<.~>::,?,:~e ~f0-37¢-6300 N~w Yo~,K $TKt~ OVlqCt: SUite i04, ;*ON We~t Genesee St~t. C;.mfilus. NY 13031, Tc!:,~!v~¢ 315-¢68-2723