Loading...
Vista Ridge Lot 6 D-CS170712 Priscilla Martinez From:Marcus Marion Sent:Wednesday, July 12, 2017 10:39 AM To:Priscilla Martinez Subject:Coppell Surgical Center A correspondence for Coppell Surgical Center about steel size Marcus D. Marion City of Coppell (469)576-7707 mmarion@coppelltx.gov Begin forwarded message: From: Robert Schneeberg <robert.schneeberg@gs-engineers.com> Date: July 11, 2017 at 3:07:14 PM CDT To: 'Jose Mondragon' <jmondragon@linksconstruction.com>, "'Ball, Jeff'" <jeff@bwaarchitects.com> Cc: 'Koby Short' <kshort@linksconstruction.com>, 'George Marshall' <GMarshall@coppelltx.gov>, 'Marcus Marion' <MMarion@coppelltx.gov> Subject: RE: Reinforcement approached & Top of Curb Jose, As is noted on the cover sheet of the approved plan set for this project and as discussed at the preconstruction conference for this project, the City’s Standard Construction Details apply to all work on this project. I believe that you, Koby and your paving sub were at the preconstruction conference. If you do not have a set of these details in your job trailer please download and print them as soon as possible. The link is: http://www.coppelltx.gov/Documents/Forms/AllItems.aspx?RootFolder=%2FDocuments%2FGovernme nt%2FEngineering Standard Detail 2120 for Integral Curb and Gutter clearly shows the rebar in the top of the curb, and in Note 1, calls for it to be a No. 4 rebar unless otherwise noted. George Marshall told us that No. 3 rebar was acceptable for this project. I will confirm with him that that is the case. A rebar will be required continuously inside the top of the curb. Standard Drive Approach Details 2150-2 and 2155-2 call for drive approach rebar to be No. 3 rebar on 18” centers each way. I do not know why there is any confusion on this requirement. George and Marion have been copied with this email. Please let me know what else we can do to assist you with this issue. Thanks, Robert Schneeberg, P.E., R.P.L.S. 1 Gonzalez & Schneeberg, Engineers & Surveyors, Inc. TX Engineering Firm Reg. No. F-3376 TX Surveying Firm Reg. No. 100752-00 Please note our new address: 2100 Lakeside Blvd., Suite 200 Richardson, TX 75082 Phone: 972-516-8855 - Ext. 106 From: Jose Mondragon \[mailto:jmondragon@linksconstruction.com\] Sent: Tuesday, July 11, 2017 2:40 PM To: 'Ball, Jeff' <jeff@bwaarchitects.com>; Robert Schneeberg <robert.schneeberg@gs-engineers.com> Subject: Reinforcement approached & Top of Curb ASC COPPELL SURGERY CENTER Location: 731 Plaza Blvd. TX 75019 Job #: 07-16186-2 Hello, Mr. Ball & Mr. Schneeberg URGENT!! RFI # 15 inform us that we proceed with the reinforcement of concrete, for the pavement, with rebar # 3. The City of Coppell is requiring that the approaches should be reinforced with rebar # 4. The drawings do not show any details of reinforcement of the approaches. Also the City requires that at the top of the curve should be put a rebar # 4. Standard Construction Details of Coppell (Standard Detail Sheet 2120); Shows three different details that do not refer to curb, these details show curb and gutter together. The concrete company is refusing to put this rebar # 4 requiring the detail of the approaches and curb details authorized by Links. Your prompt response and solution to these issues is appreciated. Thanks, Jose Mondragon Project Superintendent Links Construction, LLC 525 S. Loop 288 Suite 105 Denton, TX 76205 940-566-5465 Office / Cell 940-783-2295 877-305-4657 Fax 2 jmondragon@linksconstruction.biz www.linksconstruction.biz NOTICE: This E-mail (including attachments) is covered by the Electronic Communications Privacy Act, 18 U.S.C. 2510-2521, is confidential and may be legally privileged. If you are not the intended recipient, you are hereby notified that any retention, dissemination, distribution or copying of this communication is strictly prohibited. Please reply to the sender that you have received the message in error, then delete it. 3