9th Grade Center-LR170711R9400001 11-21-16 Rev.16 Page 1 of 1 FOUNDATION OBSERVATIONS REPORT Report Number:94171164.0086 Service Date: 07/11/17 8901 Carpenter Fwy Ste 100 Report Date:07/13/17 Dallas, TX 75247-4547 Task:214-630-1010 Reg No: F-3272 Client Project Coppell ISD Coppell ISD 9th Grade Center Attn: Louis Macias 1301 Wrangler Circle 1303 Wrangler Cir Coppell, TX 75019 Coppell, TX 75019 Project No.94171164 Pier Identification LF/L10 1438 LF/L9 1439 1426 LF/L8 1440 LF/L7 1469 1427 Required Pier Diameter (in.)24 24 24 18 18 24 Required Penetration (ft.)10.0 10.0 10.0 10.0 10.0 10.0 Depth to Top of Bearing Stratum from Ground (ft.)35.1 35.4 35.5 31.0 32.0 33.9 Depth to Bottom of Pier from Ground Surface (ft.)45.4 45.6 45.6 41.4 42.2 44.2 Actual Penetration (ft.)10.3 10.2 10.1 10.4 10.2 10.3 Casing Outside Diameter (in.) 26 26 26 20 20 26 Depth to Bottom of Casing (ft.)35.4 35.4 35.5 31.0 32.0 33.0 Condition of Bottom (wet or dry)Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no)Yes Yes Yes Yes Yes Yes Number of Vertical Bars (ea.)6 6 6 6 6 6 Reinforcing Bar Size (#)6 6 6 6 6 6 Time Drilling was Completed 0950 1030 1521 1218 1302 1509 Time Concrete Placement was Completed 1130 1247 1700 1323 1400 1605 Distance from Ground to Top of Concrete (ft.)-1.4 -1.4 1.2 -1.4 -1.4 1.2 Total Length of Concrete Pier (ft.)44.0 44.2 46.8 40.0 40.8 45.4 Top of Ground Elevation (ft.)N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.)N/A N/A N/A N/A N/A N/A COMMENTS:Piers LE.5/L10 (1435) and LE.5/L9 (1436) hit existing piers. BEARING MATERIAL:Gray shale DRILLING CONTRACTOR:Wylie Drilling Services:Drilled pier observation. Terracon Rep:Jason Carrizales Reported To: Contractor:Northstar Builders Group, LLC Lunch/NC: Report Distribution (1) Coppell ISD, Louis Macias (1) Corgan Associates Inc, Keith Cummins(1) Glenn Engineering, Robert Howman (1) Northstar Builders Group, Charles Posey Reviewed By:____________________________________ (1) Northstar Builders Group, Jeff Miller (1) Northstar Builders Group, Justin Dunkin Daniel Wood (1) Northstar Builders Group, Roberto Gonzalez (1) Sizelove Construction, Nathan Hayward Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.