Loading...
Gateway BP(1.4)-CS170725'00 ��DWI a CIVIL ENGINEERS — PLANNERS — SURVEYORS jMi &P,.S]H A L]L z July 24, 2017 Mr. George S. Marshall, P.E. Engineering Manager City of Coppell Engineering Department 255 Parkway Boulevard Coppell, TX 75019 RE: Gateway Business Park, Lot IR -2 and 3A -R, Block 2 Haverty's Furniture Expansion Second Construction Plan Review Dear Mr. Marshall: Pursuant to the City of Coppell's second review of the above referenced construction plans, Goodwin and Marshall, Inc. (G&M) offers the following changes and explanations. In response to the City of Coppell's review comments dated July 21, 2417, concerning the above referenced projects, we offer the following changes and explanations. Staff's comments are listed first followed by G&M's responses in blue italics. 1) Page 13: a. Revise flume to inlet with pipe to culvert no need for a flume in this location. The,flume near the northeast corner of the site has been replaced with a 10' curb inlet and 24 " RCP that connects to the existing 6'x 5 ' RCB. Mr. Marshall, I appreciate Staff's time and consideration with this project. Please let me know if you require any additional information, or if there are any additional comments we need to address at this time. Sincerely, Goodwin & Marshall, Inc. John W. Andersen II, P.E. TEXAS • 2405 Mustang Drive • Grapevine, 7X 76051 • 817.379.4373 TENNESSEE - 60174 Apple Tree Drive • Memphis, TM 38115 • 901.551.9188 ARIZONA - 6909 West Sar Road, Suite 15 • {Handler, A7 IS226 • 601.118.7285 COLORADO ° $400 E. Prentice Ave. • Greenwood Village, C0 80111 303.459,4861