July 24, 2017
Mr. George S. Marshall, P.E.
Engineering Manager
City of Coppell
Engineering Department
255 Parkway Boulevard
Coppell, TX 75019
RE: Gateway Business Park, Lot IR -2 and 3A -R, Block 2
Haverty's Furniture Expansion
Second Construction Plan Review
Dear Mr. Marshall:
Pursuant to the City of Coppell's second review of the above referenced construction plans,
Goodwin and Marshall, Inc. (G&M) offers the following changes and explanations. In response
to the City of Coppell's review comments dated July 21, 2417, concerning the above referenced
projects, we offer the following changes and explanations. Staff's comments are listed first
followed by G&M's responses in blue italics.
1) Page 13:
a. Revise flume to inlet with pipe to culvert no need for a flume in this location.
The,flume near the northeast corner of the site has been replaced with a 10' curb
inlet and 24 " RCP that connects to the existing 6'x 5 ' RCB.
Mr. Marshall, I appreciate Staff's time and consideration with this project. Please let me know if
you require any additional information, or if there are any additional comments we need to address
at this time.
Sincerely,
Goodwin & Marshall, Inc.
John W. Andersen II, P.E.