Prologis Park-LR170720UE
If
T.V Inspection Vactor Cleaning Trench Safety
972-556-2913 VVWW.UESERVICES.NET
Project Name
Park - One Twenty Location
Freeport
Oneogis
Date
7/20/2017 10:10
Direction Of Survey
Downstream
City
Coppell
PO Number
Run Number
1
Purpose
Pre -Acceptance
Operator Name
Jason
Completed
Yes
Comments
Asset ID
Line A
Pipe Size
18 inch
Pipe Material
Reinforced Concrete Pipe
Pipe Shape
Circular
Lining Method
Total Length
Length Surveyed
474.9
Year Laid
Year Renewed
Sewer Use
Stormwater
Jpstream MH Number
Upstream MH Depth
8+30(inlet)
UpstreamMH Location
Upstream MH Notes
Downstream MH 3+54
Number
Downstream MH
Location
Amount of Flow
Media Number
Contractor Name Calhar Construction
VCR Start Index
Created with the
Downstream MH Depth
Downstream MH Notes
Signs Of Surcharge No
Truck Number UES TV Truck 19
Weather Dry
VCR End Index
report generator Back
T.V Inspection Factor Cleaning Trench Safety
972-556-2913 w'VI#IAl.UESERVICES.N'ET
Project Name: Prologis Park - One Twenty One
Date: 7/20/2017 10:10:00 AM
Asset ID: Line A
Location: Freeport
Upstream MH Number: 8+30(inlet)
Length Surveyed: 474.9
Downstream MH Number: 3+54
Run Number: 1
Direction Of Survey: Downstream
Pipe Size: 18 inch
Pipe Material: Reinforced Concrete Pipe
(4.0) SI - Start Inspection
(474.9) EI - End Inspection
Total Distance: 474.9
Created with the -- _
ID Number: 8+30(inlet)
(148.0) - Lat A-5 - Position: 9
(287.2) - Lat A-4 - Position: 9
(474.9) - Lat A-3 - Position: 9
ID Number: 3+54
-u,2W,, report generator Back
UE
T.V Inspection 1W Vactor Cleaning Trench Safety
972-556-2913 WWW.UESERVICES.NET
Project Name
Prologis Park - One Twenty Location
Freeport
One
Date
7/20/2017 10:45
Direction Of Survey
Downstream
City
Coppell
PO Number
Run Number
2
Purpose
Pre -Acceptance
Operator Name
Jason
Completed
Yes
Comments
Asset ID
Line A
Pipe Size
18 inch
Pipe Material
Reinforced Concrete Pipe
Pipe Shape
Circular
Lining Method
Total Length
Length Surveyed
348.1
Year Laid
Year Renewed
Sewer Use
Stormwater
Jpstream MH Number
3+54
Upstream MH Depth
UpstreamMH Location
Upstream MH Notes
Downstream MH
0+00
Downstream MH Depth
Number
Downstream MH
Downstream MH Notes
Location
Amount of Flow
Signs Of Surcharge
No
Media Number
Truck Number
UES TV Truck 19
Contractor Name
Calhar Construction
Weather
Dry
VCR Start Index
VCR End Index
Created with the -- =_ I report generator Back
T.V Inspection Vactor Cleaning * Trench Safety
972-556-2913 wWW.UESERVICES.N'ET
Project Name: Prologis Park - One Twenty One
Date: 7/20/2017 10:45:00 AM
Asset ID: Line A
Location: Freeport
Upstream MH Number: 3+54
Length Surveyed: 348.1
Downstream MH Number: 0+00
Run Number: 2
Direction Of Survey: Downstream
Pipe Size: 18 inch
Pipe Material: Reinforced Concrete Pipe
100.1) ID Number: 3+54
(4.0) SI - Start Inspection
(124.1) - Lat A-2 - Position: 9
(289.4) - Lat A-1 - Position: 9
(348.1) EI - End Inspection
Total Distance: 348.1 ID Number: 0+00
Created with the report generator Back
T.V Inspection Vactor Cleaning Trench Safety
UES -0f,
UTILITY & ENVIRON. ENTAL
L SERVICES, INC. 972-556-2913 VVWW.UESERVICES.NET
Project Name
Park - One Twenty Location
Freeport
Oneogis
Date
7/20/2017 11:05
Direction Of Survey
Downstream
City
Coppell
PO Number
Run Number
3
Purpose
Pre -Acceptance
Operator Name
Jason
Completed
Yes
Comments
Asset ID
Line C
Pipe Size
36,42,48 inch
Pipe Material
Reinforced Concrete Pipe
Pipe Shape
Circular
Lining Method
Total Length
Length Surveyed
452.4
Year Laid
Year Renewed
Sewer Use
Stormwater
Jpstream MH Number
8+58
Upstream MH Depth
UpstreamMH Location
Upstream MH Notes
Downstream MH
Number
3+93
Downstream MH Depth
Downstream MH
Location
Amount of Flow
Media Number
Downstream MH Notes
Signs Of Surcharge
Truck Number
Contractor Name Calhar Construction Weather
VCR Start Index VCR End Index
No
UES TV Truck 19
Dry
Created with the = = L { report generator Back
Tall Inspection *'actor Cleaning Trench Safety
972-556-2913 www.UES9ERVICES.NET
Project Name: Prologis
Park - One Twenty One
Date: 7/20/2017 11:05:00 AM
Asset ID: Line C
Location: Freeport
Upstream MH Number: 8+58
Length Surveyed: 452.4
Downstream MH Number: 3+93
Run Number: 3
Direction Of Survey: Downstream
Pipe Size: 36,42,48 inch
Pipe Material: Reinforced Concrete Pipe
noo-, ID Number: 8+58
(4.0) SI - Start Inspection
(139.5) - Pipe Size Change to 42 inch
(355.0) - Pipe Size Change to 48 inch •.-
(452.4) EI - End Inspection
Total Distance: 452.4
Created with the —
(65.9) - Lat C-7 - Position: 9
(145.6) - Lat C-6 - Position:
(249.0) - Lat C-5 - Position: 9
(361.6) - Lat C-4 - Position: 9
(452.4) - Lat C-3 - Position: 9
ID Number: 3+93
report generator Back
UE
T.V Inspection Vactor Cleaning Trench Safety
972-556-2913 VAVW.UESERVICES.NET
Project Name
Park - One Twenty Location
Freeport
Oneogis
Date
7/20/2017 11:15
Direction Of Survey
Downstream
City
Coppell
PO Number
Run Number
4
Purpose
Pre -Acceptance
Operator Name
Jason
Completed
Yes
Comments
Asset ID
Line C
Pipe Size
48 inch
Pipe Material
Reinforced Concrete Pipe
Pipe Shape
Circular
Lining Method
Total Length
Length Surveyed
382.3
Year Laid
Year Renewed
Sewer Use
Stormwater
Upstream MH Number
3+93
Upstream MH Depth
UpstreamMH Location
Upstream MH Notes
Downstream MH
0+00
Downstream MH Depth
Number
Downstream MH
Downstream MH Notes
Location
Amount of Flow
Signs Of Surcharge
No
Media Number
Truck Number
UES TV Truck 19
Contractor Name
Calhar Construction
Weather
Dry
VCR Start Index
VCR End Index
Created with the report generator Back
T.V Inspection 'Vactor Clearing *Trench Safety
972-556-2913 W'U W.UESERVICES.NET
Project Name: Prologis Park - One Twenty One
Date: 7/20/2017 11:15:00 AM
Asset ID: Line C
Location: Freeport
Upstream MH Number: 3+93
Length Surveyed: 382.3
Downstream MH Number: 0+00
Run Number: 4
Direction Of Survey: Downstream
Pipe Size: 48 inch
Pipe Material: Reinforced Concrete Pipe
(4.0) SI - Start Inspection
(382.3) EI - End Inspection
Total Distance: 382.3
Created with the _ -
ID Number: 3+93
(114.7)- Lat C-1 - Position: 9
ID Number: 0+00
�' report generator Back
T.V Inspection Vactor Cleaning Trench Safety
972-556-2913 VVW'IaV.UESER'VICES.NET
Project Name
Prologis Park
- One Twenty Location
Freeport
Reinforced Concrete Pipe
One
Lining Method
Date
7/20/2017 11:16 Direction Of Survey
Downstream
City
Coppell
PO Number .
Sewer Use Stormwater
Run Number
5
Purpose
Pre -Acceptance
Operator Name
Jason
Completed
Yes
Comments
Asset ID
Lat C-7
Pipe Size 18 inch
Pipe Material
Reinforced Concrete Pipe
Pipe Shape Circular
Lining Method
Total Length
Length Surveyed
177.7
Year Laid
Year Renewed
Sewer Use Stormwater
1Jpstream MH Number
1+82(inlet)
Upstream MH Depth
UpstreamMH Location
Upstream MH Notes
Downstream MH
N b
0+00(wye)
Downstream MH Depth
U111 er
Downstream MH
Location
Amount of Flow
_ ----------- - - -- — - - --- - - ----_------
Media
. ---- Media Number
Contractor Name Calhar Construction
VCR Start Index
Downstream MH Notes
Signs Of Surcharge No
Truck Number UES TV Truck 19
Weather Dry
VCR End Index
Back
Created with the - = f� report generator
T.V Inspection * Factor Cleaning Trench Safety
972-556-2913 wWW.UESERVICES.NET
Project Name: Prologis Park - One Twenty One
Date: 7/20/2017 11:16:00 AM
Asset ID: Lat C-7
Location: Freeport
Upstream MH Number: 1+82(inlet)
Length Surveyed: 177.7
Downstream MH Number: 0+00(wye)
Run Number: 5
Direction Of Survey: Downstream
Pipe Size: 18 inch
lPipe Material: Reinforced Concrete Pipe
(4.0) SI - Start Inspection
(112.2) L - Lateral - Position: 3 ..
(177.7) EI - End Inspection
Total Distance: 177.7
!!"'� ID Number: 1+82(inlet)
ID Number: 0+00(wye)
Created with thereport generator Back
Project Name
Date
City
Run Number
Operator Name
Comments
T.V Inspection Vactor Cleaning Trench Safety
972-556-2913 VAM.U'ESERVICES.NET
Prologis Park - One Twenty Location
One
7/20/2017 14:48 Direction Of Survey
Coppell PO Number
6 Purpose
Jason Completed
Freeport
Upstream
Pre -Acceptance
Yes
Asset ID
Lat C-2
Pipe Size
18 inch
Pipe Material
Reinforced Concrete Pipe
Pipe Shape
Circular
Lining Method
Total Length
Length Surveyed
113.9
Year Laid
Year Renewed
Sewer Use
Stormwater
Jpstream MH Number
1+15(inlet)
Upstream MH Depth
UpstreamMH Location
Upstream MH Notes
Downstream MH
Number
0+00
Downstream MH Depth
Downstream MH
Location
Downstream MH Notes
Amount of Flow
Signs Of Surcharge
No
Media Number
�-
Truck Number
UES TV Truck 19
Contractor Name
Calhar Construction
Weather
Dry
VCR Start Index
VCR End Index
Created with the - report generator Back
UE
T.V Inspection Factor Cleaning Trench Safety
972-556-2913 wWW.UESERVICES.NET
Project Name: Prologis Park - One Twenty One
Date: 7/20/2017 2:48:00 PM
Asset ID: Lat C-2
Location: Freeport
Upstream MH Number: 1+15(inlet)
Length Surveyed: 113.9
Downstream MH Number: 0+00
Run Number: 6
Direction Of Survey: Upstream
Pipe Size: 18 inch
Pipe Material: Reinforced Concrete Pipe
(4.0) SI - Start Inspection
(113.9) EI - End Inspection
Total Distance: 113.9
) ID Number: 0+00
ID Number: 1+15(inlet)