Prologis Park-LR170720UE If T.V Inspection Vactor Cleaning Trench Safety 972-556-2913 VVWW.UESERVICES.NET Project Name Park - One Twenty Location Freeport Oneogis Date 7/20/2017 10:10 Direction Of Survey Downstream City Coppell PO Number Run Number 1 Purpose Pre -Acceptance Operator Name Jason Completed Yes Comments Asset ID Line A Pipe Size 18 inch Pipe Material Reinforced Concrete Pipe Pipe Shape Circular Lining Method Total Length Length Surveyed 474.9 Year Laid Year Renewed Sewer Use Stormwater Jpstream MH Number Upstream MH Depth 8+30(inlet) UpstreamMH Location Upstream MH Notes Downstream MH 3+54 Number Downstream MH Location Amount of Flow Media Number Contractor Name Calhar Construction VCR Start Index Created with the Downstream MH Depth Downstream MH Notes Signs Of Surcharge No Truck Number UES TV Truck 19 Weather Dry VCR End Index report generator Back T.V Inspection Factor Cleaning Trench Safety 972-556-2913 w'VI#IAl.UESERVICES.N'ET Project Name: Prologis Park - One Twenty One Date: 7/20/2017 10:10:00 AM Asset ID: Line A Location: Freeport Upstream MH Number: 8+30(inlet) Length Surveyed: 474.9 Downstream MH Number: 3+54 Run Number: 1 Direction Of Survey: Downstream Pipe Size: 18 inch Pipe Material: Reinforced Concrete Pipe (4.0) SI - Start Inspection (474.9) EI - End Inspection Total Distance: 474.9 Created with the -- _ ID Number: 8+30(inlet) (148.0) - Lat A-5 - Position: 9 (287.2) - Lat A-4 - Position: 9 (474.9) - Lat A-3 - Position: 9 ID Number: 3+54 -u,2W,, report generator Back UE T.V Inspection 1W Vactor Cleaning Trench Safety 972-556-2913 WWW.UESERVICES.NET Project Name Prologis Park - One Twenty Location Freeport One Date 7/20/2017 10:45 Direction Of Survey Downstream City Coppell PO Number Run Number 2 Purpose Pre -Acceptance Operator Name Jason Completed Yes Comments Asset ID Line A Pipe Size 18 inch Pipe Material Reinforced Concrete Pipe Pipe Shape Circular Lining Method Total Length Length Surveyed 348.1 Year Laid Year Renewed Sewer Use Stormwater Jpstream MH Number 3+54 Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH 0+00 Downstream MH Depth Number Downstream MH Downstream MH Notes Location Amount of Flow Signs Of Surcharge No Media Number Truck Number UES TV Truck 19 Contractor Name Calhar Construction Weather Dry VCR Start Index VCR End Index Created with the -- =_ I report generator Back T.V Inspection Vactor Cleaning * Trench Safety 972-556-2913 wWW.UESERVICES.N'ET Project Name: Prologis Park - One Twenty One Date: 7/20/2017 10:45:00 AM Asset ID: Line A Location: Freeport Upstream MH Number: 3+54 Length Surveyed: 348.1 Downstream MH Number: 0+00 Run Number: 2 Direction Of Survey: Downstream Pipe Size: 18 inch Pipe Material: Reinforced Concrete Pipe 100.1) ID Number: 3+54 (4.0) SI - Start Inspection (124.1) - Lat A-2 - Position: 9 (289.4) - Lat A-1 - Position: 9 (348.1) EI - End Inspection Total Distance: 348.1 ID Number: 0+00 Created with the report generator Back T.V Inspection Vactor Cleaning Trench Safety UES -0f, UTILITY & ENVIRON. ENTAL L SERVICES, INC. 972-556-2913 VVWW.UESERVICES.NET Project Name Park - One Twenty Location Freeport Oneogis Date 7/20/2017 11:05 Direction Of Survey Downstream City Coppell PO Number Run Number 3 Purpose Pre -Acceptance Operator Name Jason Completed Yes Comments Asset ID Line C Pipe Size 36,42,48 inch Pipe Material Reinforced Concrete Pipe Pipe Shape Circular Lining Method Total Length Length Surveyed 452.4 Year Laid Year Renewed Sewer Use Stormwater Jpstream MH Number 8+58 Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH Number 3+93 Downstream MH Depth Downstream MH Location Amount of Flow Media Number Downstream MH Notes Signs Of Surcharge Truck Number Contractor Name Calhar Construction Weather VCR Start Index VCR End Index No UES TV Truck 19 Dry Created with the = = L { report generator Back Tall Inspection *'actor Cleaning Trench Safety 972-556-2913 www.UES9ERVICES.NET Project Name: Prologis Park - One Twenty One Date: 7/20/2017 11:05:00 AM Asset ID: Line C Location: Freeport Upstream MH Number: 8+58 Length Surveyed: 452.4 Downstream MH Number: 3+93 Run Number: 3 Direction Of Survey: Downstream Pipe Size: 36,42,48 inch Pipe Material: Reinforced Concrete Pipe noo-, ID Number: 8+58 (4.0) SI - Start Inspection (139.5) - Pipe Size Change to 42 inch (355.0) - Pipe Size Change to 48 inch •.- (452.4) EI - End Inspection Total Distance: 452.4 Created with the — (65.9) - Lat C-7 - Position: 9 (145.6) - Lat C-6 - Position: (249.0) - Lat C-5 - Position: 9 (361.6) - Lat C-4 - Position: 9 (452.4) - Lat C-3 - Position: 9 ID Number: 3+93 report generator Back UE T.V Inspection Vactor Cleaning Trench Safety 972-556-2913 VAVW.UESERVICES.NET Project Name Park - One Twenty Location Freeport Oneogis Date 7/20/2017 11:15 Direction Of Survey Downstream City Coppell PO Number Run Number 4 Purpose Pre -Acceptance Operator Name Jason Completed Yes Comments Asset ID Line C Pipe Size 48 inch Pipe Material Reinforced Concrete Pipe Pipe Shape Circular Lining Method Total Length Length Surveyed 382.3 Year Laid Year Renewed Sewer Use Stormwater Upstream MH Number 3+93 Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH 0+00 Downstream MH Depth Number Downstream MH Downstream MH Notes Location Amount of Flow Signs Of Surcharge No Media Number Truck Number UES TV Truck 19 Contractor Name Calhar Construction Weather Dry VCR Start Index VCR End Index Created with the report generator Back T.V Inspection 'Vactor Clearing *Trench Safety 972-556-2913 W'U W.UESERVICES.NET Project Name: Prologis Park - One Twenty One Date: 7/20/2017 11:15:00 AM Asset ID: Line C Location: Freeport Upstream MH Number: 3+93 Length Surveyed: 382.3 Downstream MH Number: 0+00 Run Number: 4 Direction Of Survey: Downstream Pipe Size: 48 inch Pipe Material: Reinforced Concrete Pipe (4.0) SI - Start Inspection (382.3) EI - End Inspection Total Distance: 382.3 Created with the _ - ID Number: 3+93 (114.7)- Lat C-1 - Position: 9 ID Number: 0+00 �' report generator Back T.V Inspection Vactor Cleaning Trench Safety 972-556-2913 VVW'IaV.UESER'VICES.NET Project Name Prologis Park - One Twenty Location Freeport Reinforced Concrete Pipe One Lining Method Date 7/20/2017 11:16 Direction Of Survey Downstream City Coppell PO Number . Sewer Use Stormwater Run Number 5 Purpose Pre -Acceptance Operator Name Jason Completed Yes Comments Asset ID Lat C-7 Pipe Size 18 inch Pipe Material Reinforced Concrete Pipe Pipe Shape Circular Lining Method Total Length Length Surveyed 177.7 Year Laid Year Renewed Sewer Use Stormwater 1Jpstream MH Number 1+82(inlet) Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH N b 0+00(wye) Downstream MH Depth U111 er Downstream MH Location Amount of Flow _ ----------- - - -- — - - --- - - ----_------ Media . ---- Media Number Contractor Name Calhar Construction VCR Start Index Downstream MH Notes Signs Of Surcharge No Truck Number UES TV Truck 19 Weather Dry VCR End Index Back Created with the - = f� report generator T.V Inspection * Factor Cleaning Trench Safety 972-556-2913 wWW.UESERVICES.NET Project Name: Prologis Park - One Twenty One Date: 7/20/2017 11:16:00 AM Asset ID: Lat C-7 Location: Freeport Upstream MH Number: 1+82(inlet) Length Surveyed: 177.7 Downstream MH Number: 0+00(wye) Run Number: 5 Direction Of Survey: Downstream Pipe Size: 18 inch lPipe Material: Reinforced Concrete Pipe (4.0) SI - Start Inspection (112.2) L - Lateral - Position: 3 .. (177.7) EI - End Inspection Total Distance: 177.7 !!"'� ID Number: 1+82(inlet) ID Number: 0+00(wye) Created with thereport generator Back Project Name Date City Run Number Operator Name Comments T.V Inspection Vactor Cleaning Trench Safety 972-556-2913 VAM.U'ESERVICES.NET Prologis Park - One Twenty Location One 7/20/2017 14:48 Direction Of Survey Coppell PO Number 6 Purpose Jason Completed Freeport Upstream Pre -Acceptance Yes Asset ID Lat C-2 Pipe Size 18 inch Pipe Material Reinforced Concrete Pipe Pipe Shape Circular Lining Method Total Length Length Surveyed 113.9 Year Laid Year Renewed Sewer Use Stormwater Jpstream MH Number 1+15(inlet) Upstream MH Depth UpstreamMH Location Upstream MH Notes Downstream MH Number 0+00 Downstream MH Depth Downstream MH Location Downstream MH Notes Amount of Flow Signs Of Surcharge No Media Number �- Truck Number UES TV Truck 19 Contractor Name Calhar Construction Weather Dry VCR Start Index VCR End Index Created with the - report generator Back UE T.V Inspection Factor Cleaning Trench Safety 972-556-2913 wWW.UESERVICES.NET Project Name: Prologis Park - One Twenty One Date: 7/20/2017 2:48:00 PM Asset ID: Lat C-2 Location: Freeport Upstream MH Number: 1+15(inlet) Length Surveyed: 113.9 Downstream MH Number: 0+00 Run Number: 6 Direction Of Survey: Upstream Pipe Size: 18 inch Pipe Material: Reinforced Concrete Pipe (4.0) SI - Start Inspection (113.9) EI - End Inspection Total Distance: 113.9 ) ID Number: 0+00 ID Number: 1+15(inlet) Created with the -- SII report generator Back