Loading...
Prologis Park-CS170801Casey W. Dillon Vice President, Dev Prologis 2021 McKinney Av Dallas, Texas 75201 T H E C 1 T Y O F COFFELL T o X A s i a a Manager Suite 1050 August 1, 2017 RE: Final Acceptance Letter Prologis Park Lot 1R Blk B (Building 6) Dear Mr. Dillon: Representatives of the (City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds have been received and the record drawing have been submitted and approved. Maturity on the bonds will be two years from the date of this letter. You may notify MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow up inspection) of the facilities will be conducted prior to the lapse of the two- year bond period. If any punch list items are noted at that time, you will be contacted to make repairs. Sincerely, Matthew Mabry Construction Inspector Office Phone: (214) 406-5223 cc: Ken Griffin, P.E., Director of Engineering and Public Works Kent Collins, P.E., Assistant Director of Engineering Michael Garza, P.E., Assistant Director of Public Works Suzanne Arnold Chief Building Official Tim Oates, Deputy Fire Chief Jennifer Miller, Finance Director A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 94718 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV