Loading...
Vista Ridge Lot 6 D-LR170815 Stormwater Construction Site Inspection Report G eneral I nformatIon Project Name: Coppell Surgery Center Location: 731 Plaza Boulevard, Coppell TX 75019 th Date of Inspection: Tuesday, August 15 2017 Start/End Time: 9 am Jose Mondragon Project Superintendent 940-793-2295 Describe present phase of construction: Exterior Metal framing, City sidewalks, Type of Inspection: X Regular --storm event W eather I nformatIon Has there been a storm event since the last inspection? X Storm Start Date & Time: Storm Duration (hrs): Approximate Amount of Precipitation (in): Weather at time of this inspection? Cloudy Temperature: No If yes, describe: If yes, describe: C ertIfICatIon S tatement supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the p Signature of Inspector Printed Name and Title Date o verall S Ite I SSueS Below are some general site issues that should be assessed during inspections. Customize this list as needed for conditions at your site. BMP/activity Implemented? Maintenance Corrective Action Needed Required? and Notes 1. All inactive slopes and disturbed Yes areas have been stabilized. 2. Are natural resource areas (e.g., Yes streams, wetlands, mature trees, etc.) protected with barriers or similar BMPs? 3. Are all sanitary waste receptacles Yes placed in secondary containment and free of leaks? 4. Are perimeter controls and Yes sediment barriers adequately installed (keyed into substrate) and maintained? 5. Are discharge points and receiving Yes waters free of any sediment deposits? 6. Are storm drain inlets properly Yes protected? 7. Is the construction exit preventing Yes sediment from being tracked into the street? 8. Is trash/litter from work areas N/A collected and placed in covered dumpsters? N/A 9. Are washout facilities (e.g., paint, stucco, concrete) available, clearly marked, and maintained? 10. Are vehicle and equipment Yes fueling, cleaning, and maintenance areas free of spills, leaks, or any other deleterious material? 11. Are materials that are potential No stormwater contaminants stored inside or under cover? 12. Are non-stormwater discharges (e.g., wash water, dewatering) properly controlled? 13. (Other)