Loading...
Prologis Park-CS170809 (2) MEMORANDUM TO: John Paul, Mycon FROM: Marcus Marion, Engineering DATE: August 09, 2017 REF: Buildng 3 (South) - Engineering Punch List 1. Cut and seal any cracks on the pavement 2. Curbs need to be sealed properly 3. All storm drains need to be cleaned and inlet protection removed 4. Expansion Joints on sidewalks need to be sealed according to the City of Coppell Standard Details 5. Backfill on the sides of the sidewalk