Northpoint Add-PN170510 (3)
CITY OF COPPELL, DALLAS COUNTY,TEXAS.
#97531
CITY SUBMITTAL3-10-171
J. GIBSON SURVEY, ABSTRACT NO. 586 & 1716
DOCUMENT WAS AUTHORIZED BY S.I. ABED, P.E.
97531. THE SEAL APPEARING ON THIS
CITY SUBMITTAL05-10-172
ABED, REGISTERED PROFESSIONAL ENGINEER NO.
PART OF 11.980 ACRES, LOT 1R, BLOCK 1, NORTHPOINT ADDITION
UNDER THE RESPONSIBLE SUPERVISION OF S.I.
3
1"=40'
THESE CONSTRUCTION PLANS WERE PREPARED
SCALE:
S.I.ABED
C-5A
NORTHPOINT ADDITION
CHECKED BY:
4
CONSULTANTS, INC.
05/10/17
5
(STORM-A & LAT A-1)
DESIGN DEVELOPMENT
015018.00
6
STORM SEWER PLAN & PROFILE
7
A.I.
05/10/17
DATE:DRAWN:PROJECT #
SHEET NO:
BENCHMARKSTOP SECURITY MONUMENT WITH ACCESS COVER SET INTHE SOUTH MEDIAN, JUST NORTH OF AN INLET AT THEAND BELT LINE RD. S. (CITY OF COPPELL STATION NO:6)
INTERSECTION OF SOUTHWESTERN, BELT LINE RD. E,ELEVATION: 517.39'
1+50
1+00
0+00
PROFILE STORM SEWER 'LAT A-1'
540535530525520
6+00
5+00
4+00
3+00
2+00
PROFILE STORM SEWER-A
1+00
0+00
545540535530525520
CITY OF COPPELL, DALLAS COUNTY,TEXAS.
#97531
CITY SUBMITTAL3-10-171
J. GIBSON SURVEY, ABSTRACT NO. 586 & 1716
DOCUMENT WAS AUTHORIZED BY S.I. ABED, P.E.
97531. THE SEAL APPEARING ON THIS
CITY SUBMITTAL05-10-172
ABED, REGISTERED PROFESSIONAL ENGINEER NO.
PART OF 11.980 ACRES, LOT 1R, BLOCK 1, NORTHPOINT ADDITION
UNDER THE RESPONSIBLE SUPERVISION OF S.I.
3
1"=40'
THESE CONSTRUCTION PLANS WERE PREPARED
SCALE:
S.I.ABED
C-5B
NORTHPOINT ADDITION
CHECKED BY:
4
CONSULTANTS, INC.
05/10/17
5
(STORM-B & LAT B-1)
DESIGN DEVELOPMENT
015018.00
6
STORM SEWER PLAN & PROFILE
7
A.I.
05/10/17
DATE:DRAWN:PROJECT #
SHEET NO:
TOP SECURITY MONUMENT WITH ACCESS COVER SET IN THE SOUTH
BENCHMARKS MEDIAN, JUST NORTH OF AN INLET AT THE INTERSECTION OFSOUTHWESTERN, BELT LINE RD. E, AND BELT LINE RD. S. (CITY OFCOPPELL STATION NO:6)
ELEVATION: 517.39'
2+00
1+00
0+00
PROFILE STORM SEWER 'LAT B-1'
540535530525520
3+50
3+00
2+00
PROFILE STORM SEWER-B
1+00
0+00
535525
540530520
CITY OF COPPELL, DALLAS COUNTY,TEXAS.
#97531
CITY SUBMITTAL3-10-171
J. GIBSON SURVEY, ABSTRACT NO. 586 & 1716
DOCUMENT WAS AUTHORIZED BY S.I. ABED, P.E.
97531. THE SEAL APPEARING ON THIS
CITY SUBMITTAL05-10-172
ABED, REGISTERED PROFESSIONAL ENGINEER NO.
PART OF 11.980 ACRES, LOT 1R, BLOCK 1, NORTHPOINT ADDITION
UNDER THE RESPONSIBLE SUPERVISION OF S.I.
3
1"=30'1"=30'
THESE CONSTRUCTION PLANS WERE PREPARED
SCALE:
S.I.ABED
NORTHPOINT ADDITION
CHECKED BY:
C-6
4
CONSULTANTS, INC.
05/10/17
5
DESIGN DEVELOPMENT
UTILITY PLAN & PROFILE
015018.00
6
7
A.I.
05/10/17
DATE:DRAWN:PROJECT #
SHEET NO:
ANY PAVEMENT, IRRIGATION, LANDSCAPING
NOTES:DURING TYING INTO EXISTING WATER SYSTEM,REPAIR MUST BE MADE IMMEDIATELY
1-8"X6" TEE1-8" GATE VALVE1-6" GATE VALVE1-STD. FIRE HYDRANT
INSTALL:
INSTALL:1-8" GATE VALVE1-DBL DET. CHECK & VAULT(PER CITY STD. DETAILS PG. 4165)
BENCHMARKSTOP SECURITY MONUMENT WITH ACCESS COVER SET INTHE SOUTH MEDIAN, JUST NORTH OF AN INLET AT THEAND BELT LINE RD. S. (CITY OF COPPELL STATION NO:6)
INTERSECTION OF SOUTHWESTERN, BELT LINE RD. E,ELEVATION: 517.39'
INSTALL:HOR. BEND
INSTALL:1-8"X8" TAPPING SLEEVE& 8" GATE VALVECONN. TO EX. 8" WATER
NAME
ALOFT HOTELALOFT
PH-2 HOTELPH-2 HOTEL
DEVELOPMENT
6" FIRE DEPT.
INSTALL:CONN.
YESYES
NONO
METER
INSTALLED
SERVICE LINE3" DOMESTIC3" DOMESTIC
1" IRRIGATION1" IRRIGATION
INSTALL:1-8"X6" TEE1-8" GATE VALVE1-6" GATE VALVE
(GC TO CHECK FL. & CONNECTIONARCHITECTURAL & MEP PLAN.)@ MIN. 1% SLOPE TO THE
END FOR BLDG. CONNECTIONPOINT OF WATER & SEWER SERVICELINE TO THE BUILDING FROMINSTALL 6" SEWER SERVICEBUILDING W/CLEANOUTS PERPLUMBING CODE.
INSTALL:1-8"X6" TEE1-8" GATE VALVE1-6" GATE VALVE1-STD. FIRE HYDRANT
545
535530525520515510
END 1" IRR.
STA. 3+43.02 PROP. SAN. SWR.
END 8" PUBLIC SAN. SWR.INSTALL: 8" PLUG
STA. 3+38.02 PROP. 8" SAN. SWR.CONST. 4' DIA. MH@ MIN. 1% SLOPE TO THE BUILDING.
(MATCH WITH PROP. GRADE)PROP. 6" PRIVATE SAN. SWR. (EAST)INSTALL 6" PLUG AT THE END.
INSTALL:1-8"X6" TEE1-8" GATE VALVE1-6" GATE VALVE1-STD. FIRE HYDRANT
INSTALL:1-8"X6" TEE1-8" GATE VALVE1-6" GATE VALVE
3+00
INSTALL:6" FIRE DEPT.CONN.
PROP. 18" RCP CROSS.
2+00
INSTALL:1-8"X6" TEE1-8" GATE VALVE1-6" GATE VALVE
STA. 0+60.65 PROP. 8" SAN. SWR.
LINE TO THE BUILDING FROMARCHITECTURAL & MEP PLAN.)
END FOR BLDG. CONNECTION(GC TO CHECK FL. & CONNECTIONPOINT OF WATER & SEWER SERVICE
1+00
SAN. SWR. PROFILE (PUBLIC)
STA. 0+60.65 PROP. 8" SAN. SWR.
PROP. 27" RCP CROSS.
0+00
INSTALL:2-1"IRR.TAP w/1" METER2-3" DOM.TAP w/3" METER
STA. 0+00.00 PROP. 8" SAN. SWR.
CONNECT TO EX. MHRIM ELEV.=531.42
545
535530525520515510
STA. 0+92.16 PROP. 8" SAN. SWR.CONST. 4' DIA MH(MATCH WITH PROP. GRADE)
INSTALL:1-8" GATE VALVE1-DBL DET. CHECK & VAULT(PER CITY STD. DETAILS PG. 4165)
REMOVE EX. FH &SALVAGE TO CITYEXTEND STUBOUT &INSTALL:1-STD. FIRE HYDRANT
CITY OF COPPELL, DALLAS COUNTY,TEXAS.
#97531
CITY SUBMITTAL3-10-171
J. GIBSON SURVEY, ABSTRACT NO. 586 & 1716
DOCUMENT WAS AUTHORIZED BY S.I. ABED, P.E.
97531. THE SEAL APPEARING ON THIS
CITY SUBMITTAL05-10-172
ABED, REGISTERED PROFESSIONAL ENGINEER NO.
PART OF 11.980 ACRES, LOT 1R, BLOCK 1, NORTHPOINT ADDITION
UNDER THE RESPONSIBLE SUPERVISION OF S.I.
3
1"=40'
1"=30'
THESE CONSTRUCTION PLANS WERE PREPARED 7
SCALE:
S.I.ABED
NORTHPOINT ADDITION
CHECKED BY:
4
CONSULTANTS, INC.
05/10/17
5
DESIGN DEVELOPMENT
015018.00
EROSION CONTROL PLAN
6
7
A.I.
05/10/17
DATE:DRAWN:PROJECT #
SHEET NO:
BENCHMARKSTOP SECURITY MONUMENT WITH ACCESS COVER SET INTHE SOUTH MEDIAN, JUST NORTH OF AN INLET AT THEAND BELT LINE RD. S. (CITY OF COPPELL STATION NO:6)
INTERSECTION OF SOUTHWESTERN, BELT LINE RD. E,ELEVATION: 517.39'
TEMP. CONST. ENTRANCE
SILT FENCE
INLET PROTECTIONEXISTING CONTOURS
LEGEND
PAVED SURFACE
6" Min.
FILTER FABRIC TO BE A NON-WOVENPOLYPROPYLENE FABRIC CONFORMING TONCTCOG SPEC #2.23.3 OR EQUIVALENT.
TYPICAL ROCK RIP-RAP DETAILS
CITY OF COPPELL, DALLAS COUNTY,TEXAS.
#97531
CITY SUBMITTAL03-10-171
J. GIBSON SURVEY, ABSTRACT NO. 586 & 1716
DOCUMENT WAS AUTHORIZED BY S.I. ABED, P.E.
97531. THE SEAL APPEARING ON THIS
CITY SUBMITTAL05-10-172
ABED, REGISTERED PROFESSIONAL ENGINEER NO.
PART OF 11.980 ACRES, LOT 1R, BLOCK 1, NORTHPOINT ADDITION
UNDER THE RESPONSIBLE SUPERVISION OF S.I.
3
THESE CONSTRUCTION PLANS WERE PREPARED
NORTHPOINT ADDITION LOT 1-R-1 & 1-R-2
4
CONSULTANTS, INC.
05/10/1705/10/17
5
DESIGN DEVELOPMENT
EROSION CONTROL DETAILS
6
7