Loading...
Freeport NIP(5.1)-LR 970828GEOTECHNICAL AND ~ F:~ ~l II p ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Freeport North, Tract 5 Royal Lane and Gateview Boulevard Coppell, Texas REPORTED TO: M.E.P.C. amedcan Properties, Inc. 15303 Dallas Parkway, Suite 100, LB 10 Dallas, Texas 75248 ATTN: Mr. Robert Ahmuty REPORT NO. 51 REPORT DATE: 08-28-97 REG PROJECT NO. 2959.1 TECHNICIAN: K. Graham CONTRACTOR: McFadden & Miller, Inc. 1 D-698 Dark gray and brown clay 20.3 99.3 2 D-698 Dark gray clay (lime treated) 23.8 89.2 3 D-698 Yellowish-brown clay w/calcareous 19.0 103.0 nodules 216 08-14-97 25'N, 10'E(1) 0.0 96.3 22.8 1 96.9 217 35'N, 10'E(1) 1.0 96.7 21.7 1 97.3 218 45'N, 10'E(1 ) 2.0 97.4 23.4 1 98.0 219 55'N, 10'E(1 ) 3.0 95.1 23.7 1 95.7 220 65'N, 10'E(1 ) 4.0 95.9 22.9 1 96.5 221 300'N, 10'E(1 ) 4.0 96.0 24.5 1 96.6 222 310'N, 10'E(1 ) 3.0 96.7 23.3 1 97.3 223 320'N, 10'E(1 ) 2.0 96.3 22.8 1 96.9 224 330'N, 10'E(1 ) 1.0 97.1 22.1 1 97.7 225 340'N, 10'E(1 ) 0.0 97.1 22.1 1 97.7 226 08-15-97 28'S, 10'E(2) 0.0 100.2 21.7 1 100.8 227 28'S, 15'E(2) 1.0 98.0 22.4 1 98.6 228 28'S, 20'E(2) 2.0 99.2 22.7 1 99.8 229 28'S, 150'E(2) 0.0 97.5 22.6 1 98.1 230 28'S, 160'E(2) 1.0 97.1 22.1 1 97.7 231 28'S, 170'E(2) 2.0 99.1 22.7 1 99.7 Comments: Footnotes: Where tested, materials were in compliance with project specifications. (1) Measurements referenced from S.E. building corner. 4" sanitary sewer line backfill. (2) Measurements referenced from S.W. building corner. Electrical line backfill. 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019 Distribution: (1) M.E.P.C. American Properties, Inc./ Mr. Robed Ahmuty (1) McFadden & Miller, Inc./ Mr. Jon Jacobson (1) Meinhardt & Quintana/ ,,~,M~c. David Meinhardt ity of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone Submitted by: REED ENGINEERING GROUP, INC. Original Signed By Ronald F. Reed, P.E. RFPJcav