Construction Storm Water Site Inspection Report
Site Information
Project Name:
Haverty’s Warehouse Expansion
Permit No.:Location:770 Gateway Blvd, Coppell, Texas
TXR15774F
Date of Inspection:Start/End Time:08:54am to 09:00am
10/6/2017
Inspector Name:
Anna Humphrey
Inspector Title:
Senior Environmental Scientist
Inspector Contact
anna.humphrey@terracon.com
Information:
Inspector
Internal training, familiar with site SWPPP, and qualified compliance inspector training
Qualifications:
Describe present
phase of
Soil grading and earth work
construction:
Type of Inspection:
Regular During storm event Post-storm event
Weather Information
Has there been a storm event since the last inspection? Yes No
If yes, provide:
Storm Start Date & Time:Storm Duration (hrs):Approximate Amount of
Precipitation (in): NA
NANA
Weather at time of inspection:
Clear Cloudy Rain Sleet Fog Snow High Winds Other:
Temperature:75 F
Have any discharges occurred since the last inspection? Yes No
If yes, describe: N/A
Are there any discharges at the time of inspection? Yes No
If yes, describe: N/A
ResponsiveResourcefulReliable1
Site-specificBest Management Practices (BMPs
BMPBMPDescriptionBMPBMPCorrective Action Needed and Notes
#Installed?Maintenance
Required?
1Silt fence not buried into ground through
swale.
Silt Fence
YesNoYesNo
Silt fence is in need of proper anchor trenching
on the northern perimeter of the site.
2
Stabilized
YesNoYesNo
Construction Exits
3
Inlet ProtectionYesNoYesNo
4
Concrete Wash out
YesNoYesNo
Area
5
Rock Check Dam
YesNoYesNo
6
Filter Sock
YesNoYesNo
ResponsiveResourcefulReliable2
Overall Site Compliance
BMPActivity DescriptionBMPMaintenanceCorrective Action Needed andNotes
#Implemented?Required?
1
Slopes and disturbed
areas not actively
YesNoYesNo
being worked are
properly stabilized
2
Natural resource
areas (e.g., streams,
wetlands, mature
YesNoYesNo
trees, etc.) protected
with barriers or similar
BMPs
3
Perimeter controls and
sediment barriers
YesNoYesNo
installed and
maintained
4
Discharge points and
receiving waters
YesNoYesNo
protected from
sediment deposits
6
Construction exit to
prevent sediment from
YesNoYesNo
being tracked into the
street
7
Trash/litter from work
areas collected and
YesNoYesNo
placed in covered
dumpsters
8
Washout facilities
(e.g., paint, stucco,
concrete) available,
YesNoYesNo
clearly marked, and
maintained
9Vehicle and
equipment fueling,
cleaning, and
maintenance areas
YesNoYesNo
free of spills, leaks, or
any other deleterious
material
ResponsiveResourcefulReliable3
Silt fence in need of proper
Silt fence located
anchor trenching
across swale needs
to be buried into
ground
Inlet protection is in
place and will be fi-
nalized to BMP stan-
dard once construc-
tion commences in
this area.
Inlet protection is in
place and will be fi-
nalized to BMP stan-
dard once construc-
tion commences in
this area.
Not installed
Not installed
Not installed
Not installed
Inlet protection is in
place and will be fi-
nalized to BMP stan-
Inlet protection is in
dard once construc-
place and will be fi-tion commences in
nalized to BMP stan-
this area.
dard once construc-
tion commences in
this area.