Loading...
Freeport NIP(2.3)-CS 96092509/27 '96 ld:05 4 ymond September 25, 1996 ID:~YSE~.~SSOC. F~X:21~-386-O~8 P~GE 2 Raymond Constru~on Co.. I~. 2775 Villa C:reek Suite 230 Dallas. Texas 752]4 Phone (214) 241-557 I F~x i214) 4844708 Mr. Mike Maysc Maysc-Kiscr & Associates 14850 Quorum Drive, #201 Dallas, TX 75240 RE: Job #197 - Quill Distribution Center Change Order #3 Storm Drain: Per CE-7, CE-8 Dated 9/16/96 1.)car Mr. Mayse: The total add for the above referenced change order is $.49_sd.6fi,~0 and is broken down below. This brin§s the total project to PHASE DESCRIPTION AMOUNT 030 Utilities *Dispose Of Spoils 200 cy ~ $4.50/cy *Furnish & Install Pipe & Junction Boxes Subtotal Add (Phase 030) $ 900.00 42,972.00 $43,872.00 310 General Conditions Subtotal Overhead & Proflt Subtotal Permit & Inspection Fee TOTAL ADD CHANGE ORDER #3 (Including Tax) 1,000.00 $44,872.00 2,692.00 $47,564.00 1,902.00 $49,466.00 0'9×2? '96 14:05 214 386 05?8 ID:MAYSE~SSOC. FAX:~14-386-,'""~8 PAGE M A Y S I: K I S E R & A S $ O C I A T E S A R C H I T E C T $ , I N C. FAX COVER SHE ET atie. ndon: company name: fax number: phone nu ml~.r: job number: sub) ed.: l'rom: date: total number of pages: (including cover sheet) remarks: 14850 Quorum Drive Suite 201 Dallas Texas 75240 Phone 214-386-0338 Fax 214-386-0578