Freeport NIP(2.3)-CS 96092509/27 '96 ld:05
4 ymond
September 25, 1996
ID:~YSE~.~SSOC.
F~X:21~-386-O~8
P~GE 2
Raymond Constru~on Co.. I~.
2775 Villa C:reek Suite 230
Dallas. Texas 752]4
Phone (214) 241-557 I
F~x i214) 4844708
Mr. Mike Maysc
Maysc-Kiscr & Associates
14850 Quorum Drive, #201
Dallas, TX 75240
RE:
Job #197 - Quill Distribution Center
Change Order #3
Storm Drain: Per CE-7, CE-8 Dated 9/16/96
1.)car Mr. Mayse:
The total add for the above referenced change order is $.49_sd.6fi,~0 and is broken down below.
This brin§s the total project to
PHASE DESCRIPTION AMOUNT
030 Utilities
*Dispose Of Spoils
200 cy ~ $4.50/cy
*Furnish & Install Pipe
& Junction Boxes
Subtotal Add (Phase 030)
$ 900.00
42,972.00
$43,872.00
310
General Conditions
Subtotal
Overhead & Proflt
Subtotal
Permit & Inspection Fee
TOTAL ADD CHANGE ORDER #3
(Including Tax)
1,000.00
$44,872.00
2,692.00
$47,564.00
1,902.00
$49,466.00
0'9×2? '96 14:05
214 386 05?8
ID:MAYSE~SSOC.
FAX:~14-386-,'""~8
PAGE
M A Y S I:
K I S E R & A S $ O C I A T E S
A R C H I T E C T $ , I N C.
FAX COVER SHE ET
atie. ndon:
company name:
fax number:
phone nu ml~.r:
job number:
sub) ed.:
l'rom:
date:
total number of pages:
(including cover sheet)
remarks:
14850 Quorum Drive Suite 201 Dallas Texas 75240
Phone 214-386-0338 Fax 214-386-0578