Loading...
Connell Skaggs Addition-CS171017 ■•■ HALFF 3803 Parkwood Blvd., Ste 800 Frisco,Texas 75034 ■■■ (214)618-4570 Fax(214)618-4574 LETTER OF TRANSMITTAL To: City of Coppell Date: October 17, 2017 Engineering Department Attn: George Marshall 265 Parkway Blvd. Coppell TX, 75019 From: Brian Satagaj AVO: 32293 Email: bsatagaj(a�halff.com Project: Woodside Village Phone: 214.217.6463 Connell Skaggs Addition Lot 1 R, 3R1 & 3R2, Block 1 3rd Engineering Submittal WE ARE SENDING YOU ®Attached ® Plans ® CD/DVD VIA: ®Courier THESE ARE TRANSMITTED as checked below: ® For Review/Approval ITEMS SENT: • 2—24"x 36"Construction Plan Set • 1 —Comment Response • 1 —CD containing the above items in PDF format COMMENTS: If you have any questions please contact me at(214) 217-6463 SIGNED: BRIAN M.SATAGAJA�� �? COPIES: ® File ❑ Owner ❑ Contractor ❑ Other: Connell Skaggs Full Plan Set 2nd_06162017_v2.pdf Markup Summary Markup Page Label Author Comments 14(4) 1 14 gmarshall Adjust meter locations so public side is outside the pavement. 2 vim: ,. 14 dzbranek <ID:4>Add FH install note Sta xxxxxx Fittings Valves 1 - Fire Hydrant Assembly Per City of Coppell Standard Construction Detail 4120 3 ; 14 mgarza <ID:1>can we keep these service runs outside of the pavement. 4 14 mgarza <ID:1>is there an easement for these meters?or move the meters to the ROW. I 17(2) 5 "1-1" 17 gmarshall Pre-cast screening wall is unacceptable for Coppell. The engineering department is reviewing the wall foundation for impact to existing drainage system. 6 _ 17 gmarshall Provide a detailed plan view that shows the location of property lines and existing features like storm drain,and other utilities. Including any impacts to trees in the area. Comment Response Prepared by: Brian Satagaj Comment Response Prepared on: 10/16/2017 1. Meter locations adjusted to keep public side out of pavement per additional City coordination. 2. Plan note adjusted with arrow pointing to tee location of hydrant lateral and hydrant location. 3. Meter locations adjusted per item 1. The remaining under pavement run is private. 4. Meter locations adjusted per item 1. Proposed easement placed around water meters. 5. Revised screen wall plans (by others) included in Civil package. Based on additional coordi nation between Owner and City we believe the proposed wall to be in compliance with City stan dards. Drainage revisions shown based on impacts to existing drainage system and inlets. Ex isting curb inlets in conflict with screen wall to be replaced with new curb inlets. Drainage calcu lations updated to verify capacity of proposed inlet system. 6. A plan view has been included in the screen wall plans (by others). Additional plan notes added to Paving Plan regarding direction to contractor. Connell Skaggs Full Plan Set 2nd_06162017_v2.pdf Markup Summary Markup Page Label Author Comments 14(4) 14 gmarshall Adjust meter locations so public side is outside the pavement. 2 14 dzbranek <ID:4>Add FH install note Sta xxxxxx Fittings Valves 1 - Fire Hydrant Assembly Per City of Coppell Standard Construction Detail 4120 3 `_ 14 mgarza <ID:1>can we keep these service runs outside of the pavement. 4 14 mgarza <ID:1>is there an easement for these meters?or move the meters to the ROW. 17(2) Now 5 ' 17 gmarshall Pre-cast screening wall is unacceptable for Coppell. The engineering department is reviewing the wall foundation for impact to existing drainage system. 6 - 17 gmarshall Provide a detailed plan view that shows the location of property lines and existing - features like storm drain, and other utilities. Including any impacts to trees in the area. Comment Response Prepared by: Brian Satagaj Comment Response Prepared on: 10/16/2017 1. Meter locations adjusted to keep public side out of pavement per additional City coordination. 2. Plan note adjusted with arrow pointing to tee location of hydrant lateral and hydrant location. 3. Meter locations adjusted per item 1. The remaining under pavement run is private. 4. Meter locations adjusted per item 1. Proposed easement placed around water meters. 5. Revised screen wall plans (by others) included in Civil package. Based on additional coordi nation between Owner and City we believe the proposed wall to be in compliance with City stan dards. Drainage revisions shown based on impacts to existing drainage system and inlets. Ex isting curb inlets in conflict with screen wall to be replaced with new curb inlets. Drainage calcu lations updated to verify capacity of proposed inlet system. 6. A plan view has been included in the screen wall plans (by others). Additional plan notes added to Paving Plan regarding direction to contractor.