Loading...
Tax 2015C-PT170921 M Mir MM. WINN kir , SMALL CONSTRUCTION SITE NOTICE FOR THE Texas Commission on Environmental Quality (TCEQ) Storm Water Program TPDES GENERAL PERMIT TXR150000 The following information is posted in compliance with Part II.E.2. of the TCEQ General Permit Number TXR150000 for discharges of storm water runoff from small construction sites. Additional information regarding the TCEQ storm water permit program may be found on the interne at: http://www.tceq.state.tx.us/nav/permits/wq construction.html Operator Name: Quality Excavation, Ltd Contact Name and Phone Number: Matt Gunter 940-4654708 Intersection of Town Center Blvd and Town Center Drive in Coppell, Texas Project Description: Physical address or description of the site's location, estimated start Estimated Start: October,2r, 2017 date and projected end date, or date that disturbed Projected End: February 1fl, 2018 soils will be stabilized ZI Location of Storm Water Pollution Prevention Plan: Supt. Truck For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge) the following certification must be completed: Doug Murphy Project Manager (Typed or Printed Name Person Completing This Certification)certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.2. of TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for providing false information or for conducting unauthorized :ischarges,including the possibility of fine and imprisonment for knowing violations. Signature and Title �N; r rr1 r Date Q7-!•21''"09-19l Date Notice Removed MS4 operator notified per Part II.F.3.