Tax 2015C-PT170921 M
Mir MM.
WINN
kir ,
SMALL CONSTRUCTION SITE NOTICE
FOR THE
Texas Commission on Environmental Quality (TCEQ)
Storm Water Program
TPDES GENERAL PERMIT TXR150000
The following information is posted in compliance with Part II.E.2. of the TCEQ General Permit
Number TXR150000 for discharges of storm water runoff from small construction sites. Additional
information regarding the TCEQ storm water permit program may be found on the interne at:
http://www.tceq.state.tx.us/nav/permits/wq construction.html
Operator Name: Quality Excavation, Ltd
Contact Name and Phone Number: Matt Gunter 940-4654708
Intersection of Town Center Blvd and Town Center Drive
in Coppell, Texas
Project Description: Physical address or
description of the site's location, estimated start Estimated Start: October,2r, 2017
date and projected end date, or date that disturbed Projected End: February 1fl, 2018
soils will be stabilized ZI
Location of Storm Water Pollution Prevention Plan: Supt. Truck
For Small Construction Activities Authorized Under Part II.E.2. (Obtaining Authorization to Discharge)
the following certification must be completed:
Doug Murphy Project Manager (Typed or Printed Name Person Completing This Certification)certify under
penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part II.E.2. of
TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution prevention
plan has been developed and will be implemented prior to construction, according to permit requirements. A copy of this
signed notice is supplied to the operator of the MS4 if discharges enter an MS4. I am aware there are significant penalties for
providing false information or for conducting unauthorized :ischarges,including the possibility of fine and imprisonment for
knowing violations.
Signature and Title �N; r rr1 r Date Q7-!•21''"09-19l
Date Notice Removed
MS4 operator notified per Part II.F.3.