Loading...
Hackberry Addition-LR171018 REPORT OF WATER INJECTION OBSERVATION Springhill Suites & Convention Center - Infrastructure 150 Hackberry Road Coppell, Texas REPORTED TO: Northpoint Construction, LLC REPORT NO. 10 8530 Esters Boulevard REPORT DATE: 10-18-17 Irving, Texas 75063 REG PROJECT NO. 21924 ATTN: Mr. Jaime Ogden TECHNICIAN: K. Wicks PAGE: 1 of CONTRACTOR: Northpoint Construction, LLC On this date a representative of Reed Engineering Group, Ltd. observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted. Specification Injection Depth Injection Spacing Injection Pressure Injection Intervals (ft)(ft)(psi)(in) 15 5 100-200 12-18 Equipment Number ofNumber of Probes Length of Probes Probe Spacing Rigs(ea)(ft)(ft) 2 4 17 5 Date Area Injected (sq ft) Average Pressure (psi) Pass No. 10-10-17 1,400 100 5 Surfactant added at regular intervals: Yes Submitted by: E-Mail Distribution:(1) Northpoint Construction, LLC/ REED ENGINEERING GROUP, LTD. Mr. Jaime Ogden (1) Northpoint Construction, LLC/ Registration Number F-3114 Mr. Dilip Pranav (1) Northpoint Construction, LLC/ Mr. Robert Robles (1) Northpoint Construction, LLC/ Bill Woolwine Ms. Randee Hidalgo Sr. Manager, CMT (1) City of Coppell BW/sp Mr. Marcus Marion 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL \[214\] 350 5600 FAX \[214\] 350 0019