Loading...
Hackberry Addition-LR171016 SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Springhill Suites- CoppellNo.: 00013 PROJECT DETAILS 1. Project NameSpringhill Suites 2. Location/Address150 Hackberry Rd. 3. MS4City of Coppell, TX 75109 4. CountyDallas 5. Operator Name (control of daily operations)Northpoint Construction, LLC 6. Type PermitSmall 7. Size-Acres4.98 9. Location of SWP3 Manual / Site MapOn-site Office or with Site Contact 10. Primary Site Contact: (Decides revisions & corrective action)Jim Smith 11. Phone Number469-515-3027 12. Primary Email Contactjsmith@northpointconst.com 13. Additional email distribution listmmarion@coppelltx.gov 14. Inspection ScheduleEvery 7 Days (No Rain Events) 15. Type Of Construction ActivityConstruction of a Hotel. 16. Sediment basins or ponds?No ** Equivalent Controls (in lieu of basins)Perimeter Drainage channels and the MS4 17. Offsite Areas?No 18. Adjacent Wetlands?No 19. Critical Outfalls?Yes ** Outfall Location DescriptionsNorth drainage channel discharge points. INSPECTION DETAILS Date of Inspection10/16/2017 GPS Is this a Post Rain Event Report?No Is the Site AccessibleNo Construction PhaseExcavation/Grading Batch Plant Exist?No Submitted by Scott Young at 10/16/2017 15:50 CDTPage: 1 Captured at 10/16/2017 15:50 CDTgocanvas.com Submission ID: 95eb3164-38d3-43c9-8972-124ab7937cbb-1508185029847 SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Springhill Suites- CoppellNo.: 00013 BMPS Inspector's Observation Regarding:SWPPP Sign Corrective Action RequiredNo LocationFacing Hackberry Additional Comments Picture 1 Inspector's Observation Regarding:Rock Entrance/ Exit Corrective Action RequiredNo LocationFacing Hackberry Additional CommentsObserve Rock to be clean and effective at minimizing tracking Picture 1 Inspector's Observation Regarding:Off-Site Streets Corrective Action RequiredNo LocationSurrounding streets Additional CommentsObserve streets to be clean Picture 1 Inspector's Observation Regarding:Perimeter Silt Fence Corrective Action RequiredNo LocationSitewide Additional CommentsObserve the silt fence to be in good working order Picture 1 Inspector's Observation Regarding:Perimeter BMPs Corrective Action RequiredNo LocationNorth sector Additional CommentsObserved Rock berm at low point on slope at Perimeter to be effective in minimizing silt loss Picture 1 Inspector's Observation Regarding:Perimeter Grass Buffers Corrective Action RequiredNo LocationSite wide Additional CommentsObserve grass buffer to be effective at minimizing silt loss to off-site area Submitted by Scott Young at 10/16/2017 15:50 CDTPage: 2 Captured at 10/16/2017 15:50 CDTgocanvas.com Submission ID: 95eb3164-38d3-43c9-8972-124ab7937cbb-1508185029847 SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Springhill Suites- CoppellNo.: 00013 Picture 1 INSPECTION SUMMARY Does the Site Operators Qualify for Permit Termination?No **** Did the Inspector See Evidence of Corrective Action Since the LastNo Report? **** Additional BMP Controls are Required?No **** Some BMP Controls are Inadequate as Designed and NeedNo Improvement **** Has Illicit Discharge of Sediment Past the Project Limits Occured?No **** BMP Controls Need Maintenance or Repairs?No **** Summary of Observed Corrective Action Required:Gates were closed and locked. Submitted by Scott Young at 10/16/2017 15:50 CDTPage: 3 Captured at 10/16/2017 15:50 CDTgocanvas.com Submission ID: 95eb3164-38d3-43c9-8972-124ab7937cbb-1508185029847 SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Springhill Suites- CoppellNo.: 00013 COMPLIANCE SUMMARY No incidences of non-compliance was observed. The site is in compliance with the TXR150000 permit **** Non-compliance incidences have been noted. All non-compliance issues should be resolved within 7 days or immediately if a rain event is imminent **** Certification Statement ÒI certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware there are specific penalties for submitting false information, including the possibilities of fine and imprisonment for knowing violations.Ó **** Signature Printed NameScott Young Date10/16/2017 Inspector Phone Number469-438-4379 http://terradyne.org Website Link *** Please print this report double-sided. 1. File this report in your SWP3 Manual; keep 3 years after project completion for possible audit. 2. Log all changes to Operator responsibilities; ie areas sold to others; new Operator. 3. Update SWP3 Logs and SWP3 Site Map with current revisions. Submitted by Scott Young at 10/16/2017 15:50 CDTPage: 4 Captured at 10/16/2017 15:50 CDTgocanvas.com Submission ID: 95eb3164-38d3-43c9-8972-124ab7937cbb-1508185029847