Loading...
Gateway BP(1.4)-LR171102 Construction Storm Water Site Inspection Report Site Information Project Name: Havertys Warehouse Expansion Permit No.: TXR15774F Location: 770 Gateway Blvd, Coppell, Texas Date of Inspection: Start/End Time: 11:47am to 12:22am 11/2/2017 Inspector Name: Colette Khouri Inspector Title: Field Scientist Inspector Contact colette.khouri@terracon.com Information: Inspector Internal training, familiar with site SWPPP, and qualified compliance inspector training Qualifications: Describe present phase of Soil grading and earth work construction: Type of Inspection: Regular During storm event Post-storm event Weather Information Has there been a storm event since the last inspection? Yes No If yes, provide: Storm Start Date & Time: Storm Duration (hrs): Approximate Amount of Multiple Events Multiple Events Precipitation (in): 0.04 in (Multiple Events) Weather at time of inspection: Clear Cloudy Rain Sleet Fog Snow High Winds Other: Temperature: 84 F Have any discharges occurred since the last inspection? Yes No If yes, describe: Rain event Are there any discharges at the time of inspection? Yes No If yes, describe: N/A Responsive Resourceful Reliable 1 Site-specific Best Management Practices (BMPs BMP BMP Description BMP BMP Corrective Action Needed and Notes # Installed? Maintenance Required? 1 Silt fence is in need of proper anchor trenching on the northern and eastern perimeters of the site. Soil buildup of more than 50% on the northern Silt Fence Yes No Yes No perimeter of the site. Excess soil should be removed and be brought to BMP standards. Holes in the silt fence on the northern perimeter of the site. Silt fence should be repaired and brought to BMP standards. 2 Stabilized Yes No Yes No Construction Exits 3 Inlet Protection Yes No Yes No 4 Concrete Wash out Yes No Yes No Area 5 Rock Check Dam Yes No Yes No 6 Filter Sock Yes No Yes No Responsive Resourceful Reliable 2 Overall Site Compliance BMP Activity Description BMP Maintenance Corrective Action Needed and Notes # Implemented? Required? 1 Slopes and disturbed areas not actively Yes No Yes No N/A being worked are properly stabilized 2 Natural resource areas (e.g., streams, wetlands, mature Yes No Yes No N/A trees, etc.) protected with barriers or similar BMPs 3 Perimeter controls and sediment barriers Yes No Yes No N/A installed and maintained 4 Discharge points and receiving waters Yes No Yes No N/A protected from sediment deposits 6 Construction exit to prevent sediment from Yes No Yes No N/A being tracked into the street 7 Trash/litter from work areas collected and Yes No Yes No N/A placed in covered dumpsters 8 Washout facilities (e.g., paint, stucco, concrete) available, Yes No Yes No N/A clearly marked, and maintained 9 Vehicle and equipment fueling, cleaning, and maintenance areas Yes No Yes No N/A free of spills, leaks, or any other deleterious material Responsive Resourceful Reliable 3 10 Materials that are potential stormwater Yes No Yes No N/A contaminants stored inside or under cover 11 Allowable Non- stormwater discharges (e.g., wash water, Yes No Yes No N/A dewatering) properly controlled Comments Describe any corrective action(s) or incident(s) of non-compliance not described above (attach pictures if applicable): 1. Silt fence is in need of proper anchor trenching on the northern and eastern perimeters of the site. 2. Silt fence with soil buildup of more than 50% on the northern perimeter of the site should be removed. 3. Holes in the silt fence on the northern perimeter of the site should be repaired. CERTIFICATION STATEMENT supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing Colette Khouri, Field Scientist Print name and title: __________________________________________________________________ 11/2/17 Signature: ______________________________________________________ Date: _______________ Responsive Resourceful Reliable 4 Excess soil buildup should be Holes in the silt fence Silt fence should be removed. should be repaired. properly trenched. Silt fence should be properly trenched. Silt fence should be properly trenched. BMP not installed. BMPs not installed. Silt fence has been added as a form of inlet protection.