Prologis Park-LR171024 Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Project Name: Prologis Park One Twenty One Permit Number(s): TXR15Date: 10/24/2017 Reason for inspection: 7 Day Contractor: Prologis, L.P. Qualifications: Shown within SWP3Inspector: Juan Job:Prologis Park One Twenty One. Contr:Prologis, L.P. 32.97976, -97.011641 Weather: Sunny/Dry ControlsControl StatusActions Required Construction Entrance/Exit RemovedNone Silt Fence Installed - See ActionsRepair Inlet Protection Installed - CompliantNone Rock / Sandbag Berm Installed - See ActionsRepair Sediment Traps Installed - CompliantNone Installed - CompliantNone Vegatative Buffer Strips Erosion Control Mats Install Installed - See Actions RemovedNone Wattes / Erosion logs Concrete Wash area RemovedNone Fuel Area containment RemovedNone Velocity Dissipation devices Installed - CompliantNone Temporary Stabilization Not on ECPNone Permanent Stabilization Installed LaterNone Copyright © 2017 Project Compliance,LLC. All Rights Reserved. The site is approximately in the following construction stage: Landscape. Locations of Discharges of Sediment or Other Pollutants from the Site: None at this time. Locations of BMPs that need to be Maintained: Maintain control at curb lines. Maintain silt fence perimeter. Repair or replace sections of the silt fence damaged. Rock berms need to be cleaned and repaired. Locations of BMPs that failed to operate as designed or proved inadequate: None at this time. Locations where additional BMPs are needed: All bare areas need stabilization. Replace damaged curlex at curb lines. Gaps in the silt fence perimeter need to be closed. Additional Notes: Some areas were hydro mulched. Some areas were sodded. Maintain control as noted above. Inlets covers were removed at stabilized areas. I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. 10/24/2017 Date: ____________________ Inspector: _____________________________ Prologis Park One Twenty One - 10/24/2017 Copyright © 2017 Project Compliance,LLC. All Rights Reserved. Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Photos of the site 1.2. Replace damaged curlex at curb line.Repair or replace section of the silt fence damaged at channel. 3.4. Silt fence needs repair at channel.Repair area where residual could get under the silt fence. Prologis Park One Twenty One - 10/24/2017 Copyright © 2017 Project Compliance,LLC. All Rights Reserved. Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Photos of the site 5.6. Rock berm needs to be cleaned and repaired Rock berm needs to be cleaned. . 7.8. Section of the silt fence needs to be cleaned Rock berm needs repair. and repaired at channel. Prologis Park One Twenty One - 10/24/2017 Copyright © 2017 Project Compliance,LLC. All Rights Reserved. Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Photos of the site 9.10. Rock berm needs repair.Replace damaged curlex at curb line. 11.12. Repair or replace section of the silt fence Silt fence needs repair at E side. damaged at E side. Prologis Park One Twenty One - 10/24/2017 Copyright © 2017 Project Compliance,LLC. All Rights Reserved.